Search Climate Insights Directory
26 results
COMMENT ON THE CONSULTATION ON THE INTENTION TO PRESCRIBE MINIMUM INFORMATION REQUIREMENTS FOR BASELINE MONITORING FOR ONSHORE EXPLORATION OPERATIONS PUBLISHED ON 7 NOVEMBER 2025 IN GOVERNMENT GAZETTE NO. 6811 UNDER GOVERNMENT NOTICE NO. 53637
The Centre for Environmental Rights (CER) and Natural Justice (NJ) argue that the proposed MIR for onshore exploration in South Africa lacks the specificity, enforceable standards, and climate integration necessary to protect environmental integrity and community interests. They recommend mandatory greenhouse gas accounting, a regional cumulative impact assessment, and a comprehensive public health baseline. Technical experts in the document highlight critical gaps in groundwater monitoring, the absence of a risk-based 'traffic light protocol' for induced seismicity, and the need for transparent chemical disclosure of fracturing fluids. The authors ultimately argue that hydraulic fracturing is incompatible with South Africa's climate commitments and water scarcity, suggesting it should be prohibited.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Governing Mining Towns: Case of Lephalale
The document examines the governance of Lephalale, a mining town in Limpopo, South Africa, arguing that the municipality's lack of land ownership and institutional capacity has allowed private mining interests, specifically Exxaro and Eskom, to maintain control over urban development. It highlights how the Medupi power station project exposed these weaknesses, leading to the creation of the Lephalale Development Forum (LDF), which the author describes as a parallel administration that prioritizes corporate interests over democratic spatial integration.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Research paper
COMMENTS ON CONSULTATION PAPER 1: CONCURRENCE WITH THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM A RANGE OF ENERGY TECHNOLOGIES 2020
The Centre for Environmental Rights (CER), writing on behalf of the Life After Coal Campaign, submitted comments to the National Energy Regulator of South Africa (NERSA) regarding a draft ministerial determination to procure 2,000 MW of new generation capacity. The CER argues that this procurement must prioritize clean, affordable, and renewable energy sources over fossil fuels to align with constitutional obligations and public interest, while criticizing the lack of transparency regarding Request for Information (RFI) responses and the inadequacy of the public consultation process.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
COMMENTS ON THE DRAFT INTEGRATED RESOURCE PLAN FOR ELECTRICITY, 2018
The Centre for Environmental Rights (CER) argues that the draft IRP 2018 is unlawful and irrational because it includes 6,732MW of new coal capacity despite its own findings that a least-cost plan would exclude coal. The CER highlights severe failures in the draft, including inflated electricity demand forecasts, outdated and high cost assumptions for renewables and battery storage, and a total lack of consideration for water and climate change externalities. The document specifically objects to the Thabametsi and Khanyisa coal projects, citing their high emissions and risks to water resources in the Waterberg and Highveld regions. Furthermore, the CER criticizes the Department of Energy for failing to conduct meaningful public consultations with impacted communities and for withholding the Plexos modelling data necessary for transparent stakeholder review.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
COMMENTS ON NATIONAL PLANNING COMMISSION ECONOMY SERIES: ENERGY DISCUSSION PAPER
The Centre for Environmental Rights (CER) submits that South Africa must urgently transition from coal to renewable energy due to the declining competitiveness of coal, severe health and environmental impacts, and extreme vulnerability to climate change. The CER argues against new coal and nuclear infrastructure, recommends the decommissioning of non-compliant coal plants, and calls for a transformation of Eskom into an organ of state promoting clean energy. It further emphasizes the need for meaningful public consultation in energy planning and warns against the continued operation of high-emission facilities like Sasol's Secunda complex.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
groundWork and Earthlife Africa (Jhb) response to the National Planning Commission Energy Paper
groundWork and Earthlife Africa (Jhb) advocate for the immediate cessation of new coal, gas, and nuclear projects in South Africa, proposing instead a transition to decentralized, socially owned renewable energy to ensure environmental justice and economic viability.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Boom and Bust in the Waterberg
This report analyzes three cycles of coal expansion in the Waterberg, concluding that mega projects like Medupi and Matimba have caused severe air and water pollution, social disruption, and economic instability while failing to deliver promised development.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
RELEVANT INFORMATION IN RELATION TO THE DRAFT INTEGRATED RESOURCE PLAN FOR ELECTRICITY UPDATE & THE DRAFT INTEGRATED ENERGY PLAN
The Centre for Environmental Rights, on behalf of the Life After Coal/Impilo Ngaphandle Kwamalahle Campaign, urges the Portfolio Committee on Energy to compel the Department of Energy to release key technical data and conduct fair public consultations before finalising the IRP Update and IEP. The submission highlights the Department's failure to respond to PAIA requests for modelling assumptions and tariff implications. It further argues that the current planning ignores the health and water costs of coal, the emissions of nitrous oxide from CFB technology, and the financial viability of new coal and nuclear plants. Citing studies by Meridian Economics and the Frankfurt Institute, the document asserts that accelerating the decommissioning of older coal stations and prioritising wind and solar PV is the most cost-effective path for South Africa's energy future.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
WRITTEN COMMENTS ON THE INTEGRATED RESOURCE PLAN UPDATE: ASSUMPTIONS, BASE CASE RESULTS AND OBSERVATIONS, REVISION 1 AND ON THE DRAFT INTEGRATED ENERGY PLAN
The Centre for Environmental Rights (CER) argues that South Africa's draft Integrated Energy Plan (IEP) and Integrated Resource Plan (IRP) Update are inconsistent with the Constitution, the National Environmental Management Act (NEMA), and the National Energy Act (NEA). The CER contends that the plans unjustifiably constrain renewable energy while promoting new coal-fired power stations, which they claim cause severe health impacts and contribute to climate change. They highlight that coal-fired power is no longer the least-cost option and risks creating stranded assets. The document recommends removing build limits on wind and solar, excluding new coal and nuclear power, and conducting a comprehensive assessment of external social and environmental costs.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
SUBMISSIONS ON DRAFT CLIMATE CHANGE IMPACT ASSESSMENT REPORT FOR THABAMETSI IPP COAL-FIRED POWER STATION
The Centre for Environmental Rights, acting for Earthlife Africa Johannesburg, submitted comments on the draft Climate Change Impact Assessment (CCIA) and Palaeontological Impact Assessment (PIA) for the proposed Thabametsi coal-fired power station. The submission argues that the draft CCIA significantly underestimates greenhouse gas emissions, ignores the social cost of carbon, and fails to adequately address severe water scarcity risks in the Lephalale area. The authors contend that the project is not in the national interest due to existing excess energy capacity and that the most appropriate recommendation is a 'no go option' to avoid irreversible environmental and social harm.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
OBJECTIONS TO THE INTEGRATED WATER USE LICENCE APPLICATION FOR PROPOSED IPP THABAMETSI POWER STATION
The Centre for Environmental Rights, acting for Earthlife Africa Johannesburg, submitted formal objections on 20 January 2017 to the Integrated Water Use Licence Application (IWULA) for the proposed 1200MW coal-fired Thabametsi power station near Lephalale, Limpopo. The submission argues that the application is fatally flawed due to outdated data, failure to account for climate change, risks to groundwater and wetlands, and a lack of guaranteed water availability for the project's 40-year lifespan.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Provincial Review 2016: Limpopo
Limpopo's economy is heavily dominated by mining, particularly platinum, which drove growth during the commodity boom (2003-2011) but slowed thereafter. The province faces significant structural challenges due to a high population in former 'homeland' areas, resulting in low employment, poor infrastructure, and low median incomes compared to national averages. While large-scale national infrastructure projects like the Medupi power station provide investment, provincial spending on infrastructure remains low, and the economy continues to struggle with high joblessness and a small formal employment sector.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
SLOW POISON: AIR POLLUTION, PUBLIC HEALTH AND FAILING GOVERNANCE
The report examines the systemic failure of South African governance to protect public health from industrial air pollution. It highlights how the minerals-energy complex, dominated by entities like Eskom and Sasol, exerts economic power to bypass emission standards. The document details the dismantling of monitoring systems in hotspots like south Durban and the failure of 'Priority Areas' in the Vaal Triangle and Highveld to achieve air quality goals. It concludes that the state is complicit in a 'purposeful ignorance' by obstructing access to pollution data and allowing 'rolling postponements' of legal compliance.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
ESKOM’S APPLICATION FOR EXEMPTION FROM MINIMUM EMISSION STANDARDS AND POSTPONEMENT OF THE MINIMUM EMISSION STANDARDS TIMEFRAMES FOR ESKOM POWER STATIONS
The Centre for Environmental Rights (CER), representing several community and environmental groups, submitted comments on August 23, 2013, regarding uMoya-NILU Consulting's Plan of Study (PoS). The PoS was designed to support Eskom's applications for exemptions and postponements of Minimum Emission Standards (MES) for its power stations. The CER argues that the PoS is too narrow in scope, fails to include critical pollutants like PM2.5, uses inappropriate modelling software for near-field impacts, and lacks a mechanism to verify model outputs against real-world ambient measurements.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
ESKOM’S APPLICATION FOR EXEMPTION FROM MINIMUM EMISSION STANDARDS AND POSTPONEMENT OF THE MINIMUM EMISSION STANDARDS TIMEFRAMES FOR ESKOM POWER STATIONS
The Centre for Environmental Rights, representing several community and environmental groups, critiques the Plan of Study (PoS) supporting Eskom's request to delay compliance with minimum emission standards. The submission argues that the PoS is too narrow, failing to include PM2.5 pollutants, using an inappropriate modelling approach that treats power stations as isolated sources, and relying on the CALPUFF model for near-field analysis contrary to guidelines. The authors demand a regional-scale modelling approach, the inclusion of actual daily emission rates instead of annual averages, and a 'reality check' comparing model outputs with ambient measurements to ensure accuracy.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
SUBMISSIONS REGARDING THE REVIEW OF THE 2012 NATIONAL FRAMEWORK FOR AIR QUALITY MANAGEMENT IN THE REPUBLIC OF SOUTH AFRICA
The Centre for Environmental Rights (CER), representing groundWork, the South Durban Community Environmental Alliance (SDCEA), and the Vaal Environmental Justice Alliance (VEJA), submitted comments on 16 April 2013 regarding the draft 2012 National Framework for Air Quality Management in South Africa. The CER argues that the Department of Environmental Affairs (DEA) failed to follow prescribed review processes, ignored legislative obligations from the 2007 Framework, and provided insufficient support to municipalities for air quality management.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
2015-06-10-thabametsi-appeal-response-part-1-a761f743bf5219c0.pdf
This document is a responding statement submitted by Newshelf 1282 (Pty) Ltd (the Second Respondent) on behalf of the Centre for Environmental Rights (CER) and Earthlife Africa, Johannesburg (the Appellant). It addresses an appeal against the environmental authorisation (EA) granted by the Department of Environmental Affairs (DEA) for the construction of the 1200MW coal-fired Thabametsi power station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
2015-06-10-thabametsi-appeal-response-part-2-f0ed1f6063c9ab7b.pdf
This document is a legal response submitted by NN Attorneys on behalf of Newshelf (the Second Respondent) on 10 June 2015, addressing an appeal against the Environmental Authorisation (EA) granted for the Thabametsi coal-fired power station project in South Africa. The response defends the project's compliance with the National Environmental Management Act (NEMA) and other regulations, arguing that the project is essential for national base-load energy security and that its environmental and health impacts have been sufficiently assessed and mitigated.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
index-and-record-1.1-to-1.2-5986dbe9a7554673.pdf
This document is a response from Eskom to a request for information by the Centre for Environmental Rights. It reveals that Eskom does not have standalone decommissioning or emission reduction plans for its coal stations, but instead manages these through broader air quality strategies. A 2010 strategy included in the text outlines a prioritised approach to meeting Minimum Emission Standards, highlighting significant constraints such as water scarcity in the Highveld and the high cost of retrofits (estimated at R28 billion CAPEX in 2009 terms), while suggesting 'offset projects' as a cheaper alternative to technical upgrades.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
record-13.1-pg-25-36-e59adecb7c73ac32.pdf
This document is an excerpt from Eskom's Air Quality Strategy, detailing technical and financial plans for retrofitting power stations to meet Minimum Emission Standards, the potential for air quality offset projects, and the integration of water, coal quality, and climate change strategies.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report