Boom and Bust in the Waterberg
Summary
This report analyzes three cycles of coal expansion in the Waterberg, concluding that mega projects like Medupi and Matimba have caused severe air and water pollution, social disruption, and economic instability while failing to deliver promised development.
Key insights
- The Waterberg region has experienced two completed boom-and-bust cycles driven by mega projects: the first involving the Grootegeluk mine and Matimba power station, and the second involving the expansion of Grootegeluk and the construction of Medupi.
- Mega projects in the region are characterized by a 'fantasy world' of underestimated costs and overestimated revenues, which often leads to economic instability; for example, the cost of Medupi and Kusile escalated from an estimated R30 billion each in 2005 to R195 billion and R225 billion respectively by 2016.
- The construction of Medupi caused a population explosion in Lephalale, with the town's population more than doubling from approximately 20,000 to over 45,000, leading to a real estate bubble and subsequent market crash as construction ended.
- Environmental injustice in the Waterberg is implemented through externalization (off-loading pollution costs onto communities), enclosure (privatizing land and water), and exclusion from political decision-making.
- The Mokolo River has suffered severe degradation due to the construction of the Mokolo Dam and large-scale sand mining for Medupi, which has lowered the sand bed by 3 meters or more and damaged the aquifer's water-storage capacity.
- Eskom has avoided installing sulphur dioxide (SO2) scrubbers at Matimba and delayed them at Medupi, leading to high emissions that contribute to an estimated 626 'equivalent' deaths annually from lung and heart diseases.
- The World Bank provided a $3.75 billion loan for Medupi, which the report characterizes as 'odious debt' that shifted financial risk to the South African public purse through Treasury guarantees.
- The proposed Mokolo Crocodile Water Augmentation Project (MCWAP) phase 2A aims to transfer 'surplus effluent' from the Hartbeespoort Dam to the Waterberg, potentially introducing urban pollutants and invasive water hyacinth into the local catchment.
- The 'Boom 3' phase, consisting of proposed projects like Sasol's Mafutha and various Baseload Independent Power Producers (BLIPPs), is largely speculative and faces significant economic and legal challenges, with some projects already abandoned.
- The Integrated Resource Plan (IRP) 2018 is criticized for using exaggerated demand projections and failing to implement a real carbon constraint, effectively allowing emissions to remain high through 2035.
Cite the original document
- APA
- groundWork (2018). Boom and Bust in the Waterberg. https://groundwork.org.za/wp-content/uploads/2022/07/boom-and-bust.pdf?utm_source=reports&utm_medium=button&utm_campaign=report_download#new_tab
- Chicago
- groundWork. Boom and Bust in the Waterberg. 2018. https://groundwork.org.za/wp-content/uploads/2022/07/boom-and-bust.pdf?utm_source=reports&utm_medium=button&utm_campaign=report_download#new_tab.
- Wikipedia
- {{cite report |author=groundWork |title=Boom and Bust in the Waterberg |date=2018 |url=https://groundwork.org.za/wp-content/uploads/2022/07/boom-and-bust.pdf?utm_source=reports&utm_medium=button&utm_campaign=report_download#new_tab |access-date=5 November 2026 |via=Climate Insights Directory (document gwza-000064)}}
- BibTeX
- @techreport{groundwork2018boom, author = {{groundWork}}, title = {{Boom and Bust in the Waterberg}}, institution = {groundWork}, year = {2018}, url = {https://groundwork.org.za/wp-content/uploads/2022/07/boom-and-bust.pdf?utm_source=reports&utm_medium=button&utm_campaign=report_download#new_tab}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gwza-000064} }
Full text
Collected · Record updated