The Centre for Environmental Rights, representing several community and environmental groups, critiques the Plan of Study (PoS) supporting Eskom's request to delay compliance with minimum emission standards. The submission argues that the PoS is too narrow, failing to include PM2.5 pollutants, using an inappropriate modelling approach that treats power stations as isolated sources, and relying on the CALPUFF model for near-field analysis contrary to guidelines. The authors demand a regional-scale modelling approach, the inclusion of actual daily emission rates instead of annual averages, and a 'reality check' comparing model outputs with ambient measurements to ensure accuracy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Plan of Study (PoS) is criticised for focusing only on compliance with ambient air quality standards rather than conducting a comprehensive assessment of impacts on health, social, economic, and ecological conditions as required for an Atmospheric Impact Report (AIR).
  • The PoS fails to include PM2.5 in its modelling for 14 coal-fired power stations, despite national ambient air quality standards for PM2.5 being promulgated on 29 June 2012 and the pollutant's significant health risks.
  • The proposal to model each power station as an isolated source with a 60x60km receptor domain is deemed inappropriate due to the magnitude of emissions and the clustering of stations in the Vaal Triangle, Highveld, and Waterberg Priority Areas.
  • The use of the CALPUFF model for near-source modelling (<50km) contradicts Department of Environmental Affairs (DEA) guidelines and US EPA preferences, which recommend AERMOD for such distances.
  • The PoS's decision not to compare modelling outputs with ambient measurements is viewed as a failure to establish model accuracy, which undermines the credibility of 'what-if' scenarios.
  • The use of annual average emission rates for 2010-2012 in the PoS may underestimate actual emissions by 30% to 40%, as actual rates vary significantly from the average.
  • The PoS lacks sufficient data on emission rates and fuel compositions for the Acacia and Port Rex liquid fuel-fired power stations, which are noted for their short stack heights (14m) and urban locations.

Cite the original document

APA
Earthlife Africa (2013). ESKOM’S APPLICATION FOR EXEMPTION FROM MINIMUM EMISSION STANDARDS AND POSTPONEMENT OF THE MINIMUM EMISSION STANDARDS TIMEFRAMES FOR ESKOM POWER STATIONS. https://earthlife.org.za/wp-content/uploads/2020/06/Annexure-4_CER-submissions_Plan-of-Study_23-August-2013_final.pdf
Chicago
Earthlife Africa. ESKOM’S APPLICATION FOR EXEMPTION FROM MINIMUM EMISSION STANDARDS AND POSTPONEMENT OF THE MINIMUM EMISSION STANDARDS TIMEFRAMES FOR ESKOM POWER STATIONS. 2013. https://earthlife.org.za/wp-content/uploads/2020/06/Annexure-4_CER-submissions_Plan-of-Study_23-August-2013_final.pdf.
Wikipedia
{{cite press release |author=Earthlife Africa |title=ESKOM’S APPLICATION FOR EXEMPTION FROM MINIMUM EMISSION STANDARDS AND POSTPONEMENT OF THE MINIMUM EMISSION STANDARDS TIMEFRAMES FOR ESKOM POWER STATIONS |date=23 August 2013 |url=https://earthlife.org.za/wp-content/uploads/2020/06/Annexure-4_CER-submissions_Plan-of-Study_23-August-2013_final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document earthli-000017)}}
BibTeX
@misc{earthlifeafrica2013eskoms, author = {{Earthlife Africa}}, title = {{ESKOM’S APPLICATION FOR EXEMPTION FROM MINIMUM EMISSION STANDARDS AND POSTPONEMENT OF THE MINIMUM EMISSION STANDARDS TIMEFRAMES FOR ESKOM POWER STATIONS}}, publisher = {Earthlife Africa}, year = {2013}, month = aug, url = {https://earthlife.org.za/wp-content/uploads/2020/06/Annexure-4_CER-submissions_Plan-of-Study_23-August-2013_final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document earthli-000017} }

Full text

Collected · Record updated