Search Climate Insights Directory
1,469 documents from Centre for Environmental Rights
gg39299_nn999-4f74e9710029f71b.pdf
A 2015 notice from the South African Department of Water and Sanitation declaring the exploration and production of onshore hydrocarbons requiring stimulation, such as hydraulic fracturing, as a controlled activity under the National Water Act, 1998.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
GNR 164 of 2 March 2018 GPEMF Standard.pdf
The GPEMF Standard (GNR 164, 2018) allows certain listed activities in Gauteng's Zone 1 (Urban Development) and Zone 5 (Industrial and Commercial Focus) to proceed without a full environmental authorisation, provided the proponent registers the development, complies with specific environmental management specifications, and ensures the project remains entirely within the designated zones.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Guide
grootvlei-additional-information-349ce6e812e69f06.pdf
This briefing from Eskom to the Department of Environmental Affairs (DEA) provides additional information regarding an application to postpone compliance with Minimum Emission Standards (MES) for the Grootvlei Power Station. The document addresses DEA requests for time series plots of air quality monitoring and data regarding PM2.5 health and environmental impacts.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Briefing
grootvlei-annual-emissions-report-2015-2016-2a2617086f421177.pdf
The Grootvlei Power Station's 2015/16 Annual Emissions Report details the total atmospheric emissions for the financial year from 1 April 2015 to 31 March 2016, highlighting particulate matter challenges and the implementation of retrofit projects to reduce emissions.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
KM_C554e-20150213193246
The South African Department of Environmental Affairs granted Eskom postponements for compliance with minimum emission standards for particulate matter, sulphur dioxide, and nitrogen oxides at the Grootvlei Power Station. The decision includes a phased reduction for PM until 2020 and extended limits for SO2 and NOx until 2025, coinciding with the station's scheduled decommissioning between 2025 and 2028. Eskom must also provide a PM pollution offset plan by March 2016.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
grootvlei-power-station-5f741b44913b4ace.pdf
The Grootvlei Power Station Annual Emissions Report for the 2016/17 financial year, submitted by Eskom to the Chief Air Quality Licensing Officer, details the station's pollutant emissions, the progress of a particulate matter reduction project, and compliance with atmospheric licenses.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
IN THE HIGH COURT OF SOUTH AFRICA
This document is a supporting affidavit filed in the High Court of South Africa (Gauteng Division, Pretoria) by Sven Eaton Patrick Peek, a director of the GroundWork Trust. The affidavit serves to confirm and support the submissions made in a founding affidavit deposed to by Mphatheleni Makaulele regarding a legal matter involving several applicants, including GroundWork, and respondents including the Musina Makhado Special Economic Zone (SOC) Ltd and the Limpopo Department of Economic Development, Environment and Tourism.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
GROUNDWORK’S REPLYING SUBMISSIONS
This document contains replying submissions filed by groundWork (the Appellant) on 24 May 2019 in an appeal before the Nkangala District Municipality Appeal Authority. The appeal challenges the transfer of a 2015 Provisional Atmospheric Emission Licence (PAEL) to ACWA Power Khanyisa Thermal Power Station (RF) (Pty) Limited (ACWA). groundWork argues that the transfer was unlawful due to procedural defects, a failure to consider relevant environmental and health evidence, the unauthorized material variation of the licence's physical scope, and the provision of misleading information regarding the project's capacity.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Briefing
GROUNDWORK’S RESPONDING STATEMENT TO KARPOWERSHIP SA (PTY) LTD’S APPEAL AGAINST THE ENVIRONMENTAL AUTHORISATION REFUSAL DECISION (EA NO. 14/12/16/3/3/2/2005): NGQURA
This responding statement, submitted by groundWork, argues against an appeal by Karpowership SA (PTY) Ltd regarding the Department of Forestry, Fisheries and the Environment's (DFFE) June 23, 2021, decision to refuse Environmental Authorisation (EA) for a gas-to-power project at the Port of Ngqura. groundWork contends that the project is neither necessary nor desirable, citing significant environmental risks, inadequate public participation, and the existence of more sustainable energy alternatives.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
GROUNDWORK’S RESPONDING STATEMENT TO KARPOWERSHIP SA (PTY) LTD’S APPEAL AGAINST THE ENVIRONMENTAL AUTHORISATION REFUSAL DECISION (EA NO. 14/12/16/3/3/2/2007): RICHARDS BAY
This responding statement, submitted by groundWork to the Department of Forestry, Fisheries and the Environment (DFFE), argues for the dismissal of Karpowership SA (PTY) Ltd’s appeal against the refusal of an Environmental Authorisation (EA) for a gas-to-power project in Richards Bay. groundWork contends that the project is neither necessary nor desirable, citing significant environmental risks, inadequate public participation, and the existence of more cost-effective, renewable energy alternatives.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Exhibit 6_7[5].pdf
This document is an atlas published by the World Health Organization (WHO) that examines the impact of environmental hazards on children's health. It categorizes risks into 'traditional' hazards, such as air pollution and poor water and sanitation, and 'emerging' hazards, including chemical exposures, e-waste, and climate change. The report aligns these challenges with the Sustainable Development Goals (SDGs) and advocates for multisectoral cooperation to reduce preventable child mortality and lifelong disease risks.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
gw-objection-karpowerships-saldanha-nersa-commissioned-4.08.2021-f56e19364879c239.pdf
This document is a formal objection submitted by the Centre for Environmental Rights (CER) to the National Energy Regulator of South Africa (NERSA) regarding the proposed use of Karpowerships in Saldanha Bay. The CER argues that the project is inconsistent with South Africa's climate commitments, lacks transparency, and fails to consider cheaper, cleaner energy alternatives.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
REGULATIONS UNDER THE HAZARDOUS SUBSTANCES ACT 15 OF 1973
These regulations under the South African Hazardous Substances Act 15 of 1973 establish a strict licensing and monitoring system for Group I hazardous substances. They mandate that only qualified entities (such as manufacturers, importers, and pharmacists) hold licenses, which must be renewed annually. The rules require rigorous record-keeping in a dedicated 'hazardous substances book' for three years, specific labelling including a skull and crossbones symbol, and strict storage requirements to keep chemicals separate from food. It also prohibits sales to minors under 16 without a written order and forbids the reuse of hazardous substance containers for food or cosmetics.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Guide
CENTRE FOR ENVIRONMENTAL RIGHTS: PRACTICE NOTE
This practice note outlines the legal proceedings in the High Court of South Africa (Gauteng Division, Pretoria) regarding Case No. 51765/2017. The City of Cape Town is seeking a declaratory order stating that a section 34 determination under the Electricity Regulation Act is not necessary to establish a new power plant for the city. The Centre for Environmental Rights (CER) is applying to be admitted as amicus curiae to address issues concerning the transition to renewable energy and the environmental impacts of coal-fired power stations.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Briefing
hendrina-ael_31mar2016-083e4f9841af0b6e.pdf
This document is an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Hendrina Power Station. The licence, varied on 31 March 2016, sets out the legal conditions, emission limits, and monitoring requirements for the station's operations under the National Environmental Management: Air Quality Act, 2004.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
hendrina-ael_april-2015-b9d142910e00261d.pdf
This document is a variation of an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Hendrina Power Station. The licence, valid until 31 March 2019, regulates emissions from listed activities including solid fuel combustion, storage of liquid petroleum products, and handling of coal.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
hendrina-annual-emissions-report-2015-2016-5ffcb99779852125.pdf
The Hendrina Power Station's annual emissions report for the 2015/2016 financial year records total emissions of 9,782,189 tons of CO2, 89,088 tons of SO2, 36,653 tons of NOx, and 165 tons of N2O. The report notes the installation of new continuous emission monitoring system equipment in June 2015 and identifies CO2 and N2O as the measured greenhouse gases.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
ilovepdf_merged-48_rotated-feb7992c94841dd6.pdf
This document is an appeal filed on 17 January 2022 by Anchor Energy LNG Pty Ltd and Nseleni Power Corporation Pty Ltd against the Department of Forestry, Fisheries and the Environment's (DFFE) decision to refuse environmental authorisations for the Nseleni Independent Floating Power Plant (NIFPP) and an associated LNG receiving and storage facility at the Port of Richards Bay.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
impact-assessment-implementation-regulations-794d4b2c1ded80a0.pdf
This 2019 Phase 1 Initial Impact Assessment, produced by the Department of Environment Forestry and Fisheries (DEFF) for the South African Presidency's Socio-Economic Impact Assessment System (SEIAS), evaluates the need for regulations to enforce Air Quality Management Plans (AQMPs) in three priority areas. The document identifies a failure to meet National Ambient Air Quality Standards (NAAQS) due to ineffective AQMP implementation and a lack of accountability for non-industrial stakeholders.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
index-and-record-1.1-to-1.2-5986dbe9a7554673.pdf
This document is a response from Eskom to a request for information by the Centre for Environmental Rights. It reveals that Eskom does not have standalone decommissioning or emission reduction plans for its coal stations, but instead manages these through broader air quality strategies. A 2010 strategy included in the text outlines a prioritised approach to meeting Minimum Emission Standards, highlighting significant constraints such as water scarcity in the Highveld and the high cost of retrofits (estimated at R28 billion CAPEX in 2009 terms), while suggesting 'offset projects' as a cheaper alternative to technical upgrades.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement