Search Climate Insights Directory
9 results
DETERMINATION FOR NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL IN TERMS OF SECTION 34 ELECTRICITY REGULATION ACT 2006
The Centre for Environmental Rights (CER), acting for groundWork, sent a formal letter to the National Energy Regulator of South Africa (NERSA) on 30 October 2020. The letter requests detailed reasons and evidence for NERSA's decision to concur with a determination to procure 3,000 MW of gas and 1,500 MW of coal generation capacity between 2023 and 2027, as outlined in the Integrated Resource Plan for Electricity 2019–2030 (IRP 2019).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Prepare for Landing
The report 'Prepare for Landing' provides guidance for knowledge-based organizations to monitor and reduce carbon emissions from business travel, drawing on experiences from the Stockholm Environment Institute (SEI) and the University of East Anglia.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Hybrid Buses: Costs and Benefits
A fact sheet from the Environmental and Energy Study Institute detailing the costs, benefits, and federal funding mechanisms for hybrid-electric buses in the United States as of 2007.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Fact sheet
8.1-index-and-executive-summary-937303a5ce76d00a.pdf
This consolidated report, compiled by Siemens for Eskom, evaluates the requirements and costs for extending the operational life of the Hendrina Power Station. The study examines three scenarios: continuing operations until 2025, extending operations until 2035, and implementing capacity increases through system improvements. Based on physical inspections and desktop studies, the report finds the plant's units 1-10 to be in generally poor condition, with significant output losses due to operating limitations and forced outages.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
8.4-capacity-increase-4-86ab8141320f8e0c.pdf
This report section details the technical requirements and cost projections for increasing the capacity of the Hendrina Power Station. It focuses on necessary upgrades to generators, boiler plants (Units 1-5 and 6-10), and auxiliary systems to support higher power output and ensure operational reliability through 2035.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Scanned Document
The Minister of Mineral Resources and Energy of South Africa provides written reasons for a Ministerial Determination regarding the procurement of new generation capacity. The determination aims to ensure energy security and address load shedding by procuring capacity from renewables, storage, gas, and coal, aligned with the Integrated Resource Plan (IRP 2019).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
doc-1.1-c-sub-brd-ses-26-aug-2016_env-perf-comp-and-risks-1-c31b2e2025167439.pdf
This executive summary, submitted to the Eskom Board Sustainability and Ethics Committee on 26 August 2016, details the company's environmental performance, compliance status, and associated legal and financial risks. It highlights improvements in particulate emissions but notes failures in water usage targets and ongoing challenges with legal contraventions and regulatory compliance.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Executive summary
ANEXURE A: Responses to CER questions
This document contains the National Energy Regulator of South Africa's (NERSA) responses to questions from the Centre for Environmental Rights (CER) regarding NERSA's concurrence with section 34 determinations of the Integrated Resource Plan (IRP) 2019. NERSA asserts that its role is to implement national policy developed by the Department of Mineral Resources and Energy (DMRE), rather than to re-evaluate the IRP's modelling, cost assumptions, or technology choices.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
record-13.2-pg-11-10-40259a5c1ad8056b.pdf
This document is an excerpt from the Eskom Air Quality Strategy, detailing the company's efforts, challenges, and strategic plans to reduce particulate and gaseous emissions from its coal-fired power stations to comply with South African air quality legislation and Minimum Emission Standards.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report