Search Climate Insights Directory
17 results
Karpower in Mozambique
A fact sheet detailing the Maputo Floating Thermoelectric Power Plant Project by Karpower in Mozambique, including its technical specifications, partnership with Electricidade de Moçambique, and planned infrastructure.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Fact sheet
Comments on the Revised Atmospheric Impact Report (AIR) for the Thabametsi Power Plant prepared by uMOYA-NILU
Dr. Ranajit (Ron) Sahu provides a critique of the revised Atmospheric Impact Report (AIR) for the proposed Thabametsi Power Plant, asserting that the revised document fails to address most technical deficiencies identified in a previous review of the April 2018 AIR.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
a5-d4a0a2df5ee87c72.pdf
This document is the cover and introductory pages of an Integrated Water Use Licence Application Report dated July 2016 for the proposed Thabametsi Power Project, a coal-fired independent power producer (IPP) plant located near Lephalale in the Limpopo Province.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
acwas-further-petition-for-upliftment-of-iwul-7.11.2018-0e657327ff43c1c5.pdf
This document consists of a letter from ACWA Power Khanyisa Thermal Power Station (RF) (Pty) Ltd to the Minister of Water and Sanitation, dated 7 November 2018, requesting the upliftment of an automatic suspension of its integrated water use licence (IWUL). The suspension resulted from an appeal by the groundWork Trust, represented by the Centre for Environmental Rights (CER). ACWA Power argues that the suspension hinders project development and contradicts its existing environmental authorisation.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
ANNEXURE 6 Table 1: Summary of current annual pollutant emission rates, estimated annual average stack concentrations and Eskom’s requested emission limits
This fact sheet provides a detailed table and analysis of current pollutant emission rates (SO2, NOx, and PM10), estimated stack concentrations, and the emission limits requested by Eskom for 13 power stations. The document highlights inconsistencies in Eskom's reported data and argues that Eskom is effectively seeking exemptions from future Minimum Emission Standards (MES).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Fact sheet
annexure-a-matimba-approval-letter-88777220dbcbe945.pdf
A letter from the South African Department of Environmental Affairs granting Eskom Holdings SOC Ltd a postponement for compliance with minimum emission standards for sulfur dioxide (SO2) at the Matimba Power Station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
annexure-c_-gem09_l011_eskom_sumbission_proposed-minimum-emission_standards_feb09-1-59bb62391cb6b41c.pdf
A submission from Eskom to Working Group 1 requesting revisions to proposed Minimum Emission Standards for power plants, specifically regarding particulate matter (PM) limits for existing plants and sulfur dioxide (SO2) limits for new plants.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
KM_C554e-20150213193137
A 2015 letter from the South African Department of Environmental Affairs to Eskom regarding the Arnot Power Station's application for postponement of compliance with the National Environmental Management: Air Quality Act 39 of 2004 minimum emission standards.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
KM_C554e-20150213203305
A letter from the South African Department of Environmental Affairs to Eskom regarding the application for postponement of compliance time-frames with the National Environmental Management: Air Quality Act 39 of 2004 minimum emission standards for the Camden Power Station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
eskom-camden-90220980820cdf78.pdf
A letter from the South African Department of Environmental Affairs to Eskom stating that the postponement application for compliance with the 2015 Minimum Emission Standards for the Camden Power Station has been placed on hold due to insufficient information.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
eskom-komati-f3c3871334d36804.pdf
A letter from the South African Department of Environmental Affairs to Eskom requesting additional information regarding a postponement application for compliance with the 2015 Minimum Emission Standards for the Komati Power Station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
KM_C554e-20150223091258
A letter from the South African Department of Environmental Affairs to Eskom regarding an application for the postponement of compliance time-frames with the National Environmental Management: Air Quality Act 39 of 2004 for the Port Rex Power Station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
lethabo-annual-emissions-report-2015-2016-7191bc72ed834270.pdf
This document is a formal letter and annual emission report from Eskom's Lethabo Power Station to the Fezile Dabi District Municipality, detailing verified emissions for the 2015/2016 financial year (April 1, 2015, to March 31, 2016).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
KM_C554e-20150213203359
A letter from the South African Department of Environmental Affairs to Eskom regarding the application for postponement of compliance time-frames with the National Environmental Management: Air Quality Act 39 of 2004 for the Lethabo Power Station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
matimba-health-risk-assessment_8-64d754a8a3e40115.pdf
This report, prepared by INFOTOX (Pty) Ltd for Eskom Holdings, evaluates the confidence levels and uncertainties associated with the health risk assessment of particulate matter (PM10), nitrogen dioxide (NO2), and sulfur dioxide (SO2) emissions from Eskom operations. It concludes that risk quantifications based on mortality and particulate matter are more reliable than those based on hospitalisation and gaseous pollutants.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
KM_C554e-20150213193041
A letter from the South African Department of Environmental Affairs to Eskom regarding the Medupi Power Station's application for postponement of compliance with the National Environmental Management: Air Quality Act 39 of 2004 §21 minimum emission standards.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
port-rex-additional-information-b4f5da3b2b7ce26b.pdf
This briefing from Eskom to the Department of Environmental Affairs (DEA) provides additional information supporting a postponement application for the Port Rex Power Station to comply with Minimum Emission Standards (MES). Eskom argues that full compliance by 2015 and 2020 is not practically feasible and proposes a phased approach, noting that the station is infrequently used and slated for decommissioning around 2026.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Briefing