Browse all documents

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A letter from the South African Department of Environmental Affairs to Eskom regarding an application for the postponement of compliance time-frames with the National Environmental Management: Air Quality Act 39 of 2004 for the Port Rex Power Station.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The National Air Quality Officer denied requests for postponement regarding Particulate Matter (PM) and Sulphur Dioxide (SO2) for six units of Liquid Fuel Burning Appliances (Subcategory 1.2) at the Port Rex Power Station, stating that no application was made in those regards and the requirement to comply with minimum emission standards for existing plant remains.
  • A postponement of compliance with minimum emission standards for new plant regarding Nitrogen Oxides (NOx) was granted for the Port Rex Power Station from 01 April 2020 to 31 March 2025, with a limit of 600mg/Nm3, because the facility currently achieves compliance at that level.

Cite the original document

APA
Centre for Environmental Rights (n.d.). KM_C554e-20150223091258. https://cer.org.za/wp-content/uploads/2015/02/Eskom-Port-Rex-Applicant.pdf?x21779
Chicago
Centre for Environmental Rights. KM_C554e-20150223091258. n.d. https://cer.org.za/wp-content/uploads/2015/02/Eskom-Port-Rex-Applicant.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=KM_C554e-20150223091258 |url=https://cer.org.za/wp-content/uploads/2015/02/Eskom-Port-Rex-Applicant.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndkmc554e20150223091258, author = {{Centre for Environmental Rights}}, title = {{KM\_C554e-20150223091258}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2015/02/Eskom-Port-Rex-Applicant.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated