Search Climate Insights Directory
61 results
RECOMMENDATIONS FOR THE CLIMATE CHANGE IMPACT ASSESSMENT TO BE CONDUCTED BY THABAMETSI POWER PROJECT (PTY) LTD
The Centre for Environmental Rights (CER), on behalf of Earthlife Africa Johannesburg, provides recommendations to improve the scope of the Climate Change Impact Assessment (CCIA) and Palaeontological Impact Assessment Report (PIAR) for the proposed 1200MW Thabametsi coal-fired power station near Lephalale, Limpopo. The CER argues that the current scoping report is too narrow and fails to align with international best practices or South Africa's climate commitments under the Paris Agreement and its Intended Nationally Determined Contribution (INDC).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
RESPONDING STATEMENT TO THE APPEAL SUBMITTED BY THE CENTRE FOR ENVIRONMENTAL RIGHTS (CER) INTEGRATED ENVIRONMENTAL AUTHORISATION IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998: GN R543/544/545/546 AND THE NATIONAL ENVIRONMENTAL: WASTE ACT, 2008: GN 718 : THE CONSTRUCTION OF A 600MW INDEPENDENT POWER PLANT AND ASSOCIATED INFRASTRUCTURE FOR KIPOWER (PTY) LTD NEAR DELMAS, MPUMALANGA PROVINCE
This document is a responding statement submitted by Jones & Wagener (on behalf of Kuyasa Mining and KiPower) to the Department of Environmental Affairs (DEA). It addresses an appeal by the Centre for Environmental Rights (CER) against the granting of an integrated environmental authorisation for a 600MW coal-fired independent power plant near Delmas, Mpumalanga. The statement denies allegations that the project violates NEMA principles or environmental laws, arguing that the project aligns with the Department of Energy's Integrated Resource Plan (IRP) and employs Circulating Fluidised Bed (CFB) technology to mitigate pollutants.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
APPEAL IN TERMS OF SECTION 62 OF ESKOM’S CAMDEN POWER STATION ATMOSPHERIC EMISSION LICENCE MSUKALIGWA/ESKOM H SOC LTD/CPS/0012/2015/F02 ISSUED ON 31 MARCH 2015
The Centre for Environmental Rights (CER), representing groundWork, Earthlife Africa Johannesburg, and the Highveld Environmental Justice Network, filed an appeal on May 20, 2015, against the atmospheric emission licence (AEL) issued to Eskom's Camden Power Station. The appeal argues that the Gert Sibande District Municipality failed to consider the severe health impacts and poor air quality of the Highveld Priority Area (HPA) when granting emission limit postponements that allow pollutants to exceed national minimum emission standards (MES).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
APPEAL PURSUANT TO SECTION 43(2) OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AGAINST ENVIRONMENTAL AUTHORISATION GRANTED TO NEWSHELF 1282 (PTY) LIMITED ON 25 FEBRUARY 2015
This document is an appeal submitted by Earthlife Africa Johannesburg on 11 May 2015 to the Minister of Environmental Affairs. The appeal challenges the environmental authorisation granted on 25 February 2015 to Newshelf 1282 (Pty) Limited for the construction of the 1200 megawatt (MW) coal-fired Thabametsi power station near Lephalale in the Limpopo Province. The appellant argues that the decision was unlawful, failed to consider critical air quality and water scarcity issues, ignored climate change obligations, and violated the Promotion of Administrative Justice Act (PAJA).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Comments on the Integrated Water Use Licence Application Report for KiPower’s proposed construction of a 600 Megawatt (MW) Independent Power Producer Coal-fired Power Station
This document consists of a formal submission by the Centre for Environmental Rights (CER) and an accompanying independent peer review by Carin Bosman Sustainable Solutions (CBSS). It critiques the Integrated Water Use Licence Application (IWULA) Report prepared by Jones and Wagner for KiPower's proposed 600 MW coal-fired power station in Mpumalanga, South Africa. The CER and CBSS conclude that the IWULA is 'Inadequate' due to significant procedural and substantive failures, including the absence of a practical Integrated Water and Waste Management Plan (IWWMP) Action Plan and a failure to adequately assess impacts on groundwater and other water users.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
OBJECTIONS TO THE VARIATION OF THE ATMOSPHERIC EMISSION LICENCE FOR ESKOM’S KRIEL POWER STATION
The Centre for Environmental Rights (CER), representing various community and environmental groups, submitted formal objections to Eskom's application to vary the Atmospheric Emission Licence (AEL) for the Kriel Power Station. The CER argues that the requested increase in particulate matter (PM) emissions would exacerbate poor air quality in the Highveld Priority Area, cause significant health impacts, and result from Eskom's own poor planning rather than a genuine emergency.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
2015-06-10-thabametsi-appeal-response-part-1-a761f743bf5219c0.pdf
This document is a responding statement submitted by Newshelf 1282 (Pty) Ltd (the Second Respondent) on behalf of the Centre for Environmental Rights (CER) and Earthlife Africa, Johannesburg (the Appellant). It addresses an appeal against the environmental authorisation (EA) granted by the Department of Environmental Affairs (DEA) for the construction of the 1200MW coal-fired Thabametsi power station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
8.2-run-until-2025-15-b8a3aba8a3fd9cdd.pdf
This report section details the legislative and technical compliance requirements for the life extension (Life-ex) project at the Hendrina Power Station. It covers safety regulations for pressure equipment and boiler structures, emission limits under the South African Air Quality Act, and a comprehensive list of mandatory Eskom and international standards for turbine, electrical, and common plant areas. The document identifies specific areas of non-compliance, particularly regarding emissions, transformer maintenance, and environmental management of waste and water systems.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
8.2-run-until-2025-4-f938aecee7974c4e.pdf
This report provides a technical assessment of the boiler plant and associated systems at Hendrina Power Station, focusing on life extension (Life-ex) studies for Units 1-10. It details boiler tube leak (BTL) patterns, component replacement histories, and the degradation of pressure parts, specifically highlighting issues with fly-ash erosion, sootblower erosion, and creep exhaustion in main steam piping.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
8.4-capacity-increase-4-86ab8141320f8e0c.pdf
This report section details the technical requirements and cost projections for increasing the capacity of the Hendrina Power Station. It focuses on necessary upgrades to generators, boiler plants (Units 1-5 and 6-10), and auxiliary systems to support higher power output and ensure operational reliability through 2035.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
a6-0f99d6427224ac05.pdf
This document is an Integrated Water and Waste Management Plan (IWWMP) from July 2016 for the proposed coal-fired IPP Thabametsi Power Plant project in the Lephalale Local Municipality, Limpopo Province. It details the project's technical specifications, water requirements, and waste management infrastructure.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
KM_C554e-20180912161209
This document consists of a letter from the South African Department of Water and Sanitation to the Centre for Environmental Rights (CER) and a formal petition from ACWA Power Khanyisa Thermal Power Station (RF) (Pty) Ltd. ACWA Power is requesting that the Minister of Water and Sanitation uplift the automatic suspension of its Integrated Water Use Licence (IWUL), which was suspended following an appeal lodged by the CER on behalf of groundWork.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
annexure-8_rod-medupi-sept-20061-45785b3ada174203.pdf
The document is a Record of Decision (ROD) issued by the South African Department of Environmental Affairs and Tourism (DEAT) on September 21, 2006. It grants conditional authorization to Eskom Holdings Limited: Generation Division for the construction of a 4800MW coal-fired power station and associated infrastructure near Lephalale, while specifically excluding authorization for waste and ash disposal pending further investigation into alternatives.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
annexure-a_gem08_l186_eskom_sumbission_emission_standards_nov08-1-442e7dd7bc5dd02e.pdf
A submission from Eskom to the South African government regarding proposed minimum emission standards for combustion installations, arguing for practical limits based on technological, resource, and cost constraints.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
annexure-d-eskom_s-comments-on-notice-of-intention-to-amend-the-list-of-activities-nemaqa-91d9e06058865dae.pdf
This document is a formal statement from Eskom Holdings SOC Limited submitted to the Department of Environmental Affairs on 22 June 2017. It provides comments and recommendations regarding the 'Notice of Intention to Amend the List of Activities which Result in Atmospheric Emission' under the National Environmental Management: Air Quality Act (39/2004). Eskom argues that the proposed emission standards lack comprehensive cost-benefit analysis and could lead to severe financial and operational burdens, potentially necessitating significant electricity tariff increases.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
annexure-d-ror-d47cdf091deca383.pdf
This Record of Recommendation (RoR), dated 25 January 2017, provides the assessment by the South African Department of Water and Sanitation regarding an Integrated Water Use Licence Application (IWULA) for a 600 MW coal-fired power plant proposed by KiPower (Pty) Ltd near Delmas, Mpumalanga.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
annexures-1-f9f3564c86a643a7.pdf
This Climate Resilience Assessment (CRA), conducted by Environmental Resources Management Southern Africa Pty (Ltd) in January 2017, evaluates climate-related risks for the proposed 1,200 MW Thabametsi coal-fired power station in Lephalale, Limpopo Province, South Africa. The report identifies key vulnerabilities related to increasing temperatures, water scarcity, and extreme weather events, proposing adaptation measures to enhance the project's long-term resilience.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
camden-ael_april-2015-f45e0519cc504d2d.pdf
This document is an Atmospheric Emission Licence (AEL) issued on 31 March 2015 by the Gert Sibande District Municipality to Eskom Holdings SOC Limited for the Camden Power Station. The licence, issued under the National Environmental Management: Air Quality Act, 2004, regulates emissions from solid fuel combustion, petroleum storage, and coal handling, establishing specific operational requirements, emission limits, and monitoring obligations for a period not exceeding five years.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
duvha-ael-07-04-2015-44120652613d42d3.pdf
This document is a variation of an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Duvha Power Station. The licence, valid until 31 May 2017, regulates atmospheric emissions from listed activities including solid fuel combustion, petroleum product storage, and coal handling, setting specific emission limits for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxides (NOx).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
duvha_ael-after-appeal_jun13-f925ae6d97af40a3.pdf
This document is an Atmospheric Emission Licence (AEL) issued to Eskom Holdings SOC Limited for the Duvha Power Station in Mpumalanga, South Africa. Issued by the Mpumalanga Department of Economic Development, Environment and Tourism, the licence varies previous conditions following an appeal and establishes legal requirements for air quality management, emission limits, and monitoring for the facility's coal-fired power generation activities.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report