This report provides a technical assessment of the boiler plant and associated systems at Hendrina Power Station, focusing on life extension (Life-ex) studies for Units 1-10. It details boiler tube leak (BTL) patterns, component replacement histories, and the degradation of pressure parts, specifically highlighting issues with fly-ash erosion, sootblower erosion, and creep exhaustion in main steam piping.
Key insights
- Boiler tube leaks (BTLs) across Units 1-5 are primarily concentrated in the economizer, with element 42 recording the highest frequency of leaks (9 total from 2008 onwards). Fly-ash erosion was responsible for 48 BTLs across these units.
- Unit 1 experienced significant sootblower erosion, accounting for 16 of its 20 recorded tube leaks. This is attributed to factors such as incorrect blowing temperatures, misaligned sootblowers, or moisture traps.
- The main steam system is subject to creep exhaustion, which leads to crack formation from prolonged operation under high temperature and stress. For Unit 3, 56% of the system remains uninspected, creating a 'surprise factor' where the number of high-risk (Class 1 and 2) components may increase.
- Severe damage was identified in the manifold drain lines of Unit 3, including a 25mm linear macro crack. This was determined to be caused by extreme external loading due to inadequate support maintenance rather than creep exhaustion.
- A 2007 Siemens capacity study identified several limiting factors preventing the boilers from operating at 110% Maximum Continuous Rating (MCR), including inadequate attemperator design, steam space rate limits in the drum, and increased fly ash erosion due to higher flue gas velocity.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). 8.2-run-until-2025-4-f938aecee7974c4e.pdf. https://cer.org.za/wp-content/uploads/2017/07/8.2-Run-Until-2025-4.pdf?x21779
- Chicago
- Centre for Environmental Rights. 8.2-run-until-2025-4-f938aecee7974c4e.pdf. n.d. https://cer.org.za/wp-content/uploads/2017/07/8.2-Run-Until-2025-4.pdf?x21779.
- Wikipedia
- {{cite report |author=Centre for Environmental Rights |title=8.2-run-until-2025-4-f938aecee7974c4e.pdf |url=https://cer.org.za/wp-content/uploads/2017/07/8.2-Run-Until-2025-4.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{centreforenvironmentalrightsnd82rununtil20254f938aecee7974c4epdf, author = {{Centre for Environmental Rights}}, title = {{8.2-run-until-2025-4-f938aecee7974c4e.pdf}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2017/07/8.2-Run-Until-2025-4.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated