Search Climate Insights Directory
7 results
OBJECTIONS TO THE INTEGRATED WATER USE LICENCE APPLICATION FOR PROPOSED IPP THABAMETSI POWER STATION
The Centre for Environmental Rights, acting for Earthlife Africa Johannesburg, submitted formal objections on 20 January 2017 to the Integrated Water Use Licence Application (IWULA) for the proposed Thabametsi power station, a 1200MW coal-fired project near Lephalale, Limpopo. The objections argue that the application is legally flawed, relies on outdated data, fails to secure a sustainable water supply for the project's 40-year lifespan, and poses significant risks to groundwater and wetlands.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Comments on proposed changes to the National Water Amendment Bill as published in GN 4097 in GG 49733 of 17 November 2023
The Centre for Environmental Rights (CER) provides detailed comments on the proposed National Water Amendment Bill, focusing on the protection of water source areas, the integration of climate change resilience, and the strengthening of public participation and enforcement mechanisms in water licensing.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
11-4d604f093b78e1d1.pdf
This report, prepared by GCS Water and Environment (Pty) Ltd for the Centre for Environmental Rights (CER), reviews the Integrated Water Use License Application (IWULA) and the resulting license (IWUL) issued to Atha-Africa Ventures (Pty) Ltd for the proposed Yzermyn underground coal mine in Mpumalanga. GCS concludes that the specialist studies supporting the license are fundamentally flawed, containing significant data gaps and low-confidence modeling. The review highlights a high risk of irreversible damage to sensitive wetlands and groundwater resources, noting that the IWUL lacks sufficient conditions to mitigate these impacts and fails to authorize critical post-closure water treatment needs.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
2012-morgan-q2280-workings-of-the-water-tribunal-annex-c-906c7fd366208a26.pdf
This legal opinion, authored by Paul Kennedy SC on 16 May 2012, addresses the legal implications of the Water Tribunal operating without a duly appointed chairperson following the resignation of the previous chairperson on 31 December 2011.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
gg39299_nn999-4f74e9710029f71b.pdf
A 2015 notice from the South African Department of Water and Sanitation declaring the exploration and production of onshore hydrocarbons requiring stimulation, such as hydraulic fracturing, as a controlled activity under the National Water Act, 1998.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
record-13.3-pg-13-24-1-24613c0bb7573bb6.pdf
This document is an excerpt from Eskom's Air Quality Improvement Plan, detailing the strategy to reduce particulate and gaseous emissions from its power stations. It outlines a phased and prioritised approach to compliance with Minimum Emission Standards (MES), focusing on retrofitting the highest emitting and newest stations first. The plan identifies critical constraints including funding, water availability on the Highveld, and skilled human resources, while proposing air quality offsets in vulnerable communities to mitigate local pollution.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
wrr_case_study_china_agriculture-5012818b67af7f8a.pdf
This case study examines the integration of climate change adaptation into China's Comprehensive Agricultural Development (CAD) program, specifically through the World Bank-financed Irrigated Agriculture Intensification Loan III Project (IAIL3) and a subsequent Global Environmental Facility (GEF) grant. Focused on the 3H Plain, the initiative aimed to address water scarcity and agricultural vulnerability by implementing drought-resistant crop varieties, water-harvesting infrastructure, and capacity-building for farmers, including rural women.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Case study