Search Climate Insights Directory
4 results
LIFE AFTER COAL COMMENTS ON DRAFT 8TH NATIONAL GREENHOUSE GAS INVENTORY REPORT
The Centre for Environmental Rights, representing the Life After Coal/Impilo Ngaphandle Kwamalahle Campaign, submitted comments on the Draft 8th National Greenhouse Gas Inventory Report (NGHGIR) on 31 August 2022. The submission argues that the draft significantly undercounts methane emissions due to the omission of fugitive emissions from the oil and gas industry, pipeline transport, and abandoned mines, and criticizes the use of outdated global warming potential (GWP) metrics and low emission factors for coal mining.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
R307-205-5. Fugitive Dust
This documentS document outlines regulatory standards for the minimization of fugitive dust across various activities, including material storage, construction, demolition, road maintenance, mining, and the management of tailings piles and ponds.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Guide
anglo-ghg-report-ea3842a6ba3ee0e7.pdf
This document consists of greenhouse gas (GHG) reporting notes and data tables submitted in March 2019 for Anglo American operations in South Africa. It details the calculation methodologies for fugitive methane and carbon dioxide emissions from coal mining for Anglo Operations (Pty) Ltd and provides emission data for Anglo American Platinum and Anglo American Inyosi Coal for the year 2018.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
eskom-hendrina-april-2014-to-march-2015-annual-report-scanned-report-45d087b922d981c6.pdf
This annual report details dust deposition monitoring at the Eskom Hendrina Power Station from April 2014 to March 2015. Using a network of twenty single-bucket monitors, the study measured dust fallout rates against the South African National Dust Control Regulations, 2013. The findings indicate that the vast majority of sites remained within residential limits, with only two non-residential sites recording temporary exceedances.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report