Search Climate Insights Directory
1 result
DateDocumentOrganization and type
eskom-hendrina-april-2014-to-march-2015-annual-report-scanned-report-45d087b922d981c6.pdf
This annual report details dust deposition monitoring at the Eskom Hendrina Power Station from April 2014 to March 2015. Using a network of twenty single-bucket monitors, the study measured dust fallout rates against the South African National Dust Control Regulations, 2013. The findings indicate that the vast majority of sites remained within residential limits, with only two non-residential sites recording temporary exceedances.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Showing 1–1 of 1 document