RELEVANT INFORMATION CONCERNING THE COAL IPPS – A STUDY BY THE ENERGY RESEARCH CENTRE
The Life After Coal Campaign, comprising the Centre for Environmental Rights, groundWork, and Earthlife Africa, submitted a letter to the National Energy Regulator of South Africa (NERSA) on 7 June 2018. The letter urges NERSA to deny generation licenses for the Thabametsi and Khanyisa coal-fired independent power producer (IPP) projects, citing a University of Cape Town Energy Research Centre (ERC) report that describes the projects as economically inefficient and environmentally harmful.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
ADDITIONAL WRITTEN COMMENTS ON THE INTEGRATED RESOURCE PLAN (IRP) UPDATE: ASSUMPTIONS, BASE CASE RESULTS AND OBSERVATIONS, REVISION 1 AND ON THE DRAFT INTEGRATED ENERGY PLAN (IEP)
The Centre for Environmental Rights (CER), representing the Life After Coal/Impilo Ngaphandle Kwamalahle Campaign, submitted additional comments to the South African Department of Energy regarding the Integrated Resource Plan (IRP) and Integrated Energy Plan (IEP). The CER argues that these plans must incorporate missing cost calculations for coal and nuclear energy, as well as findings from recent studies suggesting that accelerating the decommissioning of coal plants and cancelling new coal and nuclear capacity is the most cost-effective path for Eskom and the national grid.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
UPDATE ON THE THABAMETSI POWER COMPANY (PTY) LIMITED AND ACWA POWER KHANYISA THERMAL POWER STATION (RF) (PTY) LIMITED INDEPENDENT POWER PRODUCER PROJECTS
The Centre for Environmental Rights (CER), representing Earthlife Africa Johannesburg and groundWork, sent a letter to the South African Department of Energy's IPP Office on 6 April 2017. The letter alerts the Department that two preferred bidders under the Coal Baseload Independent Power Producer Procurement Programme (CBIPPPP)—Thabametsi Power Company and ACWA Power Khanyisa—appear unable to meet the legal qualification criteria for financial and commercial close due to missing or contested environmental and generation licenses.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
the cdm project barro blanco an obstacle to peace watch this 1
The statement details the social, environmental, and human rights conflicts surrounding the Barro Blanco hydroelectric project in Panama. It highlights the resistance of the Ngäbe Bugle indigenous people, the failure of stakeholder consultations, and the ecological risks to the Tabasará River, while criticizing the project's approval under the UN's CDM offsetting scheme.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
a6-0f99d6427224ac05.pdf
This document is an Integrated Water and Waste Management Plan (IWWMP) from July 2016 for the proposed coal-fired IPP Thabametsi Power Plant project in the Lephalale Local Municipality, Limpopo Province. It details the project's technical specifications, water requirements, and waste management infrastructure.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
annexure-d-ror-d47cdf091deca383.pdf
This Record of Recommendation (RoR), dated 25 January 2017, provides the assessment by the South African Department of Water and Sanitation regarding an Integrated Water Use Licence Application (IWULA) for a 600 MW coal-fired power plant proposed by KiPower (Pty) Ltd near Delmas, Mpumalanga.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
pml9-5b95afc3bb6b566a.pdf
A letter from Atha Africa Ventures (Pty) Ltd (AAV) to the Department of Mineral Resources (DMR) requesting amendments to the conditions of a granted Mining Right for the Yzermyn Underground Coal Project (YUCP) in Mpumalanga. AAV argues that current restrictions on mining in wetland areas are too restrictive and proposes alternative wording to allow for surface infrastructure and regulated wetland disturbance.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
SEARCHER_English _Pamphlet_July2024
This guide, published by Natural Justice in July 2024, provides information and guidance for the public regarding a proposed 3D seismic survey by Searcher Geodata UK Ltd off the coast of South Africa. It outlines the project's scope, the regulatory process for environmental authorisation, and the potential negative impacts on marine biodiversity, local livelihoods, and cultural heritage.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Guide