Search Climate Insights Directory
5 results
INTEGRATED RESOURCE PLAN 2018
The Integrated Resource Plan (IRP) 2018 is a strategic update to South Africa's electricity infrastructure development plan, extending the planning horizon to 2050. It evaluates various energy mix scenarios to balance security of supply, cost, and environmental impact, specifically focusing on the transition from coal to renewable energy and gas. The document also includes a Medium-Term System Adequacy Outlook (MTSAO) for 2018-2023 and a specific climate change and water resources assessment for the proposed Thabametsi coal-fired power station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
LIFE AFTER COAL CAMPAIGN - ESKOM’S NON-COMPLIANCE WITH OBLIGATIONS TO PROTECT HUMAN HEALTH AND THE ENVIRONMENT REMAINS A MATERIAL LIABILITY
A letter from the Life After Coal Campaign to the Chairman of Eskom's Board of Directors, arguing that Eskom's reliance on coal-fired power is economically unsustainable and creates severe liabilities regarding human health, water, and the environment.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
RELEVANT INFORMATION IN RELATION TO THE DRAFT INTEGRATED RESOURCE PLAN FOR ELECTRICITY UPDATE & THE DRAFT INTEGRATED ENERGY PLAN
The Centre for Environmental Rights (CER), representing the Life After Coal/Impilo Ngaphandle Kwamalahle Campaign, submitted a formal statement to the Portfolio Committee on Energy on 29 November 2017. The document outlines critical concerns regarding the lack of transparency, inadequate public consultation, and the omission of key economic and environmental data in the development of South Africa's draft Integrated Resource Plan (IRP) for Electricity Update and the draft Integrated Energy Plan (IEP).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
ADDITIONAL WRITTEN COMMENTS ON THE INTEGRATED RESOURCE PLAN (IRP) UPDATE: ASSUMPTIONS, BASE CASE RESULTS AND OBSERVATIONS, REVISION 1 AND ON THE DRAFT INTEGRATED ENERGY PLAN (IEP)
The Centre for Environmental Rights (CER), representing the Life After Coal/Impilo Ngaphandle Kwamalahle Campaign, submitted additional comments to the South African Department of Energy regarding the Integrated Resource Plan (IRP) and Integrated Energy Plan (IEP). The CER argues that these plans must incorporate missing cost calculations for coal and nuclear energy, as well as findings from recent studies suggesting that accelerating the decommissioning of coal plants and cancelling new coal and nuclear capacity is the most cost-effective path for Eskom and the national grid.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
annexure-a-26333ba73b763b35.pdf
A formal request sent on 29 November 2016 by the Life After Coal Campaign and other environmental organisations to the South African Minister of Energy, seeking an extension for public comment on the Integrated Energy Plan (IEP) and the Integrated Resource Plan (IRP) Update and demanding the release of critical supporting documents.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement