The Namibia Quarterly Economic Review for Q1 2023 finds that Namibia is acutely vulnerable to regional power shortages, with electricity imports accounting for 71.2% of its total supply in 2022.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Namibia's economy grew by 3.5% in 2021 and 4.6% in 2022, though in real terms the economy in 2022 remained smaller than it was in 2014.
  • Namibia is highly dependent on electricity imports, which constituted 71.2% of the total supply in 2022, primarily sourced from South Africa's Eskom and Zambia's ZESCO.
  • NamPower recorded an operating loss of N$2.3 billion before net finance income in 2022, partly due to the Ruacana power station generating its lowest energy in ten years (780GWh) because of reduced rainfall in the Kunene River catchment area.
  • NamPower is developing several new projects to increase domestic capacity, including the Omburu Battery Energy Storage System (58MW) expected by end 2024, the Anixas II Power Station (50MW) expected by December 2023, and the Otjikoto Biomass Power Station (40MW) expected by end 2025.
  • The 40MW Rosh Pinah Wind Power Project was cancelled because the wind resource at the site was lower than anticipated.
  • South Africa's Eskom is facing a severe crisis characterized by unsustainable debt of approximately ZAR 423 billion and a significant increase in load-shedding, which reached 22,529GWh in 2022.
  • Zambia's ZESCO has faced power generation drops due to low water levels in Lake Kariba, leading to electricity rationing for mining firms in January 2023.

Cite the original document

APA
Institute for Public Policy Research (2023). Namibia Quarterly Economic Review. https://ippr.org.na/wp-content/uploads/2023/05/Namibia-QER-Q1-2023-amended-1.pdf
Chicago
Institute for Public Policy Research. Namibia Quarterly Economic Review. 2023. https://ippr.org.na/wp-content/uploads/2023/05/Namibia-QER-Q1-2023-amended-1.pdf.
Wikipedia
{{cite report |author=Institute for Public Policy Research |title=Namibia Quarterly Economic Review |date=2023 |url=https://ippr.org.na/wp-content/uploads/2023/05/Namibia-QER-Q1-2023-amended-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ipprna-000245)}}
BibTeX
@techreport{instituteforpublicpolicyresearch2023namibia, author = {{Institute for Public Policy Research}}, title = {{Namibia Quarterly Economic Review}}, institution = {Institute for Public Policy Research}, year = {2023}, url = {https://ippr.org.na/wp-content/uploads/2023/05/Namibia-QER-Q1-2023-amended-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ipprna-000245} }

Full text

Collected · Record updated