Green Public-Private Partnerships for Public Infrastructure in Mongolia

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines a strategy to green Mongolia's education sector by transitioning from the current Build-Transfer (BT) model to a performance-based service contract PPP model. It provides a comprehensive set of Technical Guidelines (TGs) for green schools and kindergartens, categorized into 'required', 'recommended', and 'optional' levels of technology. Validation through computer simulation indicates that adopting these green options can reduce annual energy use by over 40% and significantly lower greenhouse gas emissions and operation and maintenance (O&M) costs compared to baseline buildings from the 1980s. The report also provides policy recommendations to strengthen Mongolia's legal and institutional framework for PPPs, emphasizing the need for better coordination, transparent procurement, and the utilization of international climate finance.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Mongolia faces a significant shortage of education facilities, with 38% of young children and 12% of primary and secondary school-aged children lacking access to education due to a lack of school facilities.
  • The current Build-Transfer (BT) model used in Mongolia is deemed inappropriate because it only engages private partners in design and construction, providing no incentive for a life-cycle approach to operation and maintenance, and creating short-term fiscal pressure on the government.
  • The report recommends a performance-based service contract PPP model where the private partner is responsible for design, construction, and operation, while the government provides core education services and makes payments based on service performance.
  • Technical Guidelines (TGs) for green education buildings are divided into three levels: 'required' (meeting current codes), 'recommended' (improving efficiency), and 'optional' (incorporating renewable energy like geothermal, PV, or solar thermal).
  • Simulation results for schools show that compared to a 1980s baseline, the 'required' model reduces annual energy use by 48%, the 'recommended' by 56%, and the 'optional' by 68%.
  • Greenhouse gas (GHG) emission reductions for schools are estimated at 47% for the required model, 55% for the recommended model, and 67% for the optional model.
  • For kindergartens, the 'optional' green technology model is expected to reduce annual energy use and GHG emissions by 73% compared to the baseline.
  • Operation and maintenance (O&M) costs can be reduced by 34% or more for the required model, 40% or more for the recommended model, and up to 70% if optional technologies are implemented.
  • Key risks for green education PPPs in Mongolia include a weak legal framework, lack of coordination between government stakeholders, limited institutional capacity, and a lack of long-term financing in the local market.
  • The report suggests that the Government of Mongolia should utilize international climate finance, such as the Green Climate Fund (GCF), to diversify funding and reduce the financial burden of green infrastructure.

Cite the original document

APA
Global Green Growth Institute (2016). Green Public-Private Partnerships for Public Infrastructure in Mongolia. https://gggi.org/wp-content/uploads/2017/02/2016-Green-Public-Private-Partnerships-for-Public-Infrastructure-in-Mongolia-1.pdf
Chicago
Global Green Growth Institute. Green Public-Private Partnerships for Public Infrastructure in Mongolia. 2016. https://gggi.org/wp-content/uploads/2017/02/2016-Green-Public-Private-Partnerships-for-Public-Infrastructure-in-Mongolia-1.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=Green Public-Private Partnerships for Public Infrastructure in Mongolia |date=2016 |url=https://gggi.org/wp-content/uploads/2017/02/2016-Green-Public-Private-Partnerships-for-Public-Infrastructure-in-Mongolia-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000140)}}
BibTeX
@techreport{globalgreengrowthinstitute2016green, author = {{Global Green Growth Institute}}, title = {{Green Public-Private Partnerships for Public Infrastructure in Mongolia}}, institution = {Global Green Growth Institute}, year = {2016}, url = {https://gggi.org/wp-content/uploads/2017/02/2016-Green-Public-Private-Partnerships-for-Public-Infrastructure-in-Mongolia-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000140} }

Full text

Collected · Record updated