Search Climate Insights Directory
3 results
COMMENTS ON THE REVISED ATMOSPHERIC IMPACT REPORT AND ATMOSPHERIC EMISSION LICENCE APPLICATION FOR THE PROPOSED IPP THABAMETSI COAL-FIRED POWER STATION
The Centre for Environmental Rights (CER), on behalf of Earthlife Africa and groundWork, submitted comments on September 20, 2018, objecting to the Atmospheric Emission Licence (AEL) application for the proposed Thabametsi coal-fired power station. The CER argues that the project should be refused because it is located in an air quality priority area already in non-compliance with National Ambient Air Quality Standards (NAAQS) and is predicted to cause further non-compliance, specifically regarding sulphur dioxide (SO2). The CER claims the Atmospheric Impact Report (AIR) is fatally flawed due to gross miscalculations of emissions, missing modelling data, and a failure to adequately assess cumulative and health impacts.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
a7-bddb208750d57472.pdf
An update email from Nemai Consulting regarding the status of the Environmental Impact Assessment (EIA) for the proposed Mokolo Crocodile (West) Water Augmentation Project Phase 2.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Briefing
Medupi Flue Gas Desulphurisation: Technology Selection Study Report
The report recommends the installation of Wet FGD (WFGD) technology without a flue gas cooler for the Medupi Power Station in South Africa. While Dry FGD (CFB) uses less water, it is rejected due to 53% higher operating costs, 9% higher capital costs, and the requirement for high-quality lime sourced from the Northern Cape. WFGD is preferred for its higher efficiency on high-sulphur coals, its ability to use local lower-quality limestone to stimulate regional economic development in Lephalale, and its alignment with the Phase 2A water augmentation project.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report