a7-bddb208750d57472.pdf
Summary
An update email from Nemai Consulting regarding the status of the Environmental Impact Assessment (EIA) for the proposed Mokolo Crocodile (West) Water Augmentation Project Phase 2.
Key insights
- The Mokolo Crocodile (West) Water Augmentation Project Phase 2 involves a transfer scheme moving water from the Crocodile River (West) at Vliepoort, near Thabazimbi, to the Lephalale area in Limpopo Province.
- The EIA Announcement phase has been completed, consisting of project notification via newspaper and onsite notices, distribution of a Background information Document, registration of Interested and Affected Parties (I&APs), and meetings with authorities and I&APs in May 2016.
- The project team is addressing technical issues raised by the Department of Water and Sanitation and the technical project team; the draft Scoping Report is scheduled for public review around April 2017.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). a7-bddb208750d57472.pdf. https://cer.org.za/wp-content/uploads/2016/07/A7.pdf?x21779
- Chicago
- Centre for Environmental Rights. a7-bddb208750d57472.pdf. n.d. https://cer.org.za/wp-content/uploads/2016/07/A7.pdf?x21779.
- Wikipedia
- {{cite report |author=Centre for Environmental Rights |title=a7-bddb208750d57472.pdf |url=https://cer.org.za/wp-content/uploads/2016/07/A7.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{centreforenvironmentalrightsnda7bddb208750d57472pdf, author = {{Centre for Environmental Rights}}, title = {{a7-bddb208750d57472.pdf}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2016/07/A7.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated