Reflections of the Lamu Coal Plant Case
The National Environment Tribunal (NET) in Kenya cancelled the license for a 1050MW coal power plant in Lamu County due to inadequate public participation and the omission of a climate change assessment in the Environmental Impact Assessment (EIA).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Case study
Using the law to protect fisheries in Lamu, Kenya
The document details how the Lamu Port Three Berth Project and a proposed 1050Mw coal plant in Kwasasi threaten the livelihoods of thousands of fishers in Lamu, Kenya. It highlights the environmental impacts of these projects, including water turbidity from dredging and thermal pollution from cooling systems, and describes the legal actions taken by Natural Justice, Save Lamu, and the Katiba Institute to secure compensation and challenge project approvals.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Case study
Save Lamu & 5 Others -versus National Environmental Management Authority & Another National Environment Tribunal Appeal No. NET 196 of 2016 Summary
The National Environment Tribunal (NET) revoked the EIA licence for Amu Power Company Limited's proposed 1050MW coal plant in Kwasasi, Lamu County. The tribunal found that public participation was "non-existent" during the ESIA study phase and that the process was "procedurally unfair." Key failures included the lack of a Strategic Environmental Assessment (SEA) for the LAPSSET corridor, the omission of critical infrastructure designs (such as a 2,000-acre limestone quarry and conveyor belt), and a failure to account for Kenya's Climate Change Act, 2016. While some air quality and ecological mitigation measures were deemed adequate, the tribunal found the ash-handling plans risky due to tidal flooding and climate change. Consequently, the licence was revoked, requiring the proponent to either restart the ESIA process in accordance with the law or appeal the decision.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
lcp_license_conditions-49327fae9e8123f7.pdf
This document is a set of licensing conditions issued by the National Environment Management Authority (NEMA) on September 7, 2016, for the construction and operation of a 1050MW coal-fired power plant in Kwasasi, Lamu County, developed by Amu Power Company Limited.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
lcp_public_hearing_1-55bbcf8a94773f82.pdf
This document is a record of a public hearing held on August 26, 2016, in the Kwasasi area of Lamu regarding the Environmental Impact Assessment (EIA) for the proposed Amu Power coal-fired power plant.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report