Summary
This document is a set of licensing conditions issued by the National Environment Management Authority (NEMA) on September 7, 2016, for the construction and operation of a 1050MW coal-fired power plant in Kwasasi, Lamu County, developed by Amu Power Company Limited.
Key insights
- The project involves the construction of a 1050 MW Coal Fired Power Plant in the Kwasasi area of Hindi Division, Lamu County, with an estimated cost of Kshs.123.5 Billion.
- The EIA license is valid for 24 months from the date of issuance, which is the timeframe within which the project must commence.
- Construction requirements include obtaining approvals from the County Government of Lamu and a construction permit from the Energy Regulatory Commission under the Energy Act, No. 12 of 2006. The proponent must also ensure the plant and coal storage are located away from settlements with a reasonable buffer zone.
- Operational conditions mandate that air emissions management for pollutants such as NO2, CO, SO2, Hydrogen Sulphide, Mercury, Arsenic, and Particulate Matter (PM10) must follow World Bank (WB) and International Finance Corporation (IFC) guidelines.
- The proponent is required to implement specific environmental protections, including the use of oil water separators and silt traps in drainage facilities, and the installation of a continuous emission monitoring system.
- Notification protocols require the proponent to notify the Energy Regulatory Commission and NEMA of any system malfunction within 12 hours, and to notify NEMA of pollution incidences within 24 hours.
- Decommissioning requires the proponent to notify the Authority in writing of the intent to decommission three months in advance and submit a decommissioning plan for approval at least three months prior to the process.
Cite the original document
- APA
- Natural Justice (n.d.). lcp_license_conditions-49327fae9e8123f7.pdf. https://naturaljustice.org/wp-content/uploads/2021/01/LCP_License_conditions.pdf
- Chicago
- Natural Justice. lcp_license_conditions-49327fae9e8123f7.pdf. n.d. https://naturaljustice.org/wp-content/uploads/2021/01/LCP_License_conditions.pdf.
- Wikipedia
- {{cite press release |author=Natural Justice |title=lcp_license_conditions-49327fae9e8123f7.pdf |url=https://naturaljustice.org/wp-content/uploads/2021/01/LCP_License_conditions.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @misc{naturaljusticendlcplicenseconditions49327fae9e8123f7pdf, author = {{Natural Justice}}, title = {{lcp\_license\_conditions-49327fae9e8123f7.pdf}}, publisher = {Natural Justice}, url = {https://naturaljustice.org/wp-content/uploads/2021/01/LCP_License_conditions.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated