Search Climate Insights Directory
1 result
ESMP
The ESMP outlines the environmental and social safeguards for a project involving the dredging of 415 meters of water flow paths, cleaning of one pond, and strengthening of 211 meters of embankments in Dabri village, DI Khan. It identifies risks such as soil erosion, land sliding, and restricted community access to water, proposing mitigation measures including the construction of five check dams to control flow velocity and reduce erosion. The plan mandates the use of Personal Protective Equipment (PPE) for workers, the establishment of a Community-Based Organization (CBO) for local participation, and a four-tier Grievance Redress Mechanism (GRM). A long-term Operation and Maintenance (O&M) plan is set for 2027-2031 to ensure the sustainability of the 29,404 cubic meter water storage capacity.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report