ESKOM’S FINANCIAL CRISIS AND THE VIABILITY OF COAL-FIRED POWER IN SOUTH AFRICA
The report argues that Eskom is facing a liquidity and financial crisis driven by stagnant electricity demand and the high costs of its coal-fired power construction programme. Through system-level modelling and station-specific analysis, the study finds that the levelised costs of operating older coal stations (Arnot, Camden, Grootvlei, Hendrina, and Komati) exceed their system alternative value, meaning they can be replaced by cheaper alternatives without compromising security of supply. Specifically, decommissioning Grootvlei, Hendrina, and Komati early could save Eskom R12.5bn in present value terms. Additionally, the report finds that cancelling Kusile units 5 and 6 is economically viable if capital cost savings exceed a threshold of approximately R4.7bn. The authors conclude that South Africa no longer requires new nuclear, coal, or gas procurement, as solar PV and wind have become the most competitive new-build options.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
NOTICE OF PROVISIONAL APPEAL IN TERMS OF SECTION 62 OF THE LOCAL GOVERNMENT MUNICIPAL SYSTEMS ACT 32 of 2000 (“THE ACT”) IN RESPECT OF THE TRANSFER OF PROVISIONAL ATMOSPHERIC EMISSION LICENCE (LICENCE NO. 17/4/AEL/MP312/14/20) FROM ANGLO OPERATIONS (PTY) (LTD) TO ACWA POWER KHANYISA THERMAL POWER STATION RF (PTY) LTD FOR THE PROPOSED INDEPENDENT POWER PRODUCER KHANYISA POWER STATION (PROJECT NO. 111415) NEAR EMALAHLENI, MPUMULANGA PROVINCE
The Centre for Environmental Rights, acting on behalf of groundWork, has filed a provisional appeal under Section 62 of the Local Government Municipal Systems Act 32 of 2000 regarding the transfer of a provisional atmospheric emission licence (PAEL) for the proposed Khanyisa coal-fired power station.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
PROVISIONAL APPEAL IN TERMS OF SECTION 62 OF THE LOCAL GOVERNMENT MUNICIPAL SYSTEMS ACT 32 OF 2000
This document is a provisional appeal filed on 13 November 2017 by groundWork, represented by the Centre for Environmental Rights, against the transfer of a provisional atmospheric emission licence (PAEL) for the Khanyisa coal-fired power station. The appellant argues that the transfer from Anglo Operations (Pty) Ltd to ACWA Power Khanyisa Thermal Power Station RF (Pty) Ltd is invalid because the licence does not reflect the project's increased capacity of 600MW, fails to account for cumulative air quality impacts in the Highveld Priority Area, and was processed without required public participation or valid delegation of authority.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Water Use License Application Report (WULAR) for the Proposed Thabametsi Power Plant within the Lephalale Municipality
The Thabametsi Power Company (Pty) Ltd is applying for a Water Use License for a 630 MW coal-fired power plant near Lephalale, Limpopo. The project will use dry-cooled Circulating Fluidised Bed technology to achieve zero liquid effluent discharge. Water will be sourced via a permanent transfer of 720,000 m3/annum from Exxaro Coal (Pty) Ltd's existing allocation. The application covers several water uses under the National Water Act, including taking and storing water, altering watercourses, and disposing of waste. While the project is expected to create 14,348 jobs and support local industry, it faces challenges regarding water scarcity in the Mokolo Dam catchment and potential groundwater pollution from ash dumps and coal stockpiles. Mitigation measures include HDPE liners for pollution control dams and a comprehensive groundwater monitoring program.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
BROKEN PROMISES
The report concludes that the Highveld Priority Area (HPA) has failed to improve air quality over the decade since its 2007 declaration. Despite the 2012 air quality management plan, ambient air quality remains out of compliance with health-based standards, largely due to industrial non-compliance and government failure in monitoring and enforcement. The authors highlight a deterioration in the monitoring network, inadequate dust control for mining, and a lack of resources and skilled staff within local municipalities. The report specifically criticizes the National Air Quality Officer for granting compliance postponements to major polluters Eskom and Sasol, arguing that this has hindered pollution reduction and violated the constitutional rights of residents.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
What is the true cost of coal in Central Java?
The document examines the 'true cost' of coal-fired power in Central Java, Indonesia, contrasting the financial and social costs of planned coal expansion against the potential of renewable energy. It argues that current capacity plans may lead to unnecessary overcapacity and that the inclusion of health and climate externalities makes renewables a cheaper alternative.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Case study
EXPLORING COLLABORATION BETWEEN MDBs AND NATIONAL ENTITIES ON ENVIRONMENTAL AND SOCIAL SAFEGUARDS: THE CASE OF SOUTH AFRICA AND ETHIOPIA
The paper examines the shift toward 'country ownership' in environmental and social (E&S) safeguards, where MDBs increasingly allow borrowing nations to use their own national systems. Through case studies of South Africa's Medupi Power Station and Ethiopia's road sector, the authors analyze the tension between MDB technical standards and national development priorities. While South Africa is presented as a model of high legislative alignment, Ethiopia illustrates challenges including capacity gaps, limited civil society participation, and the influence of non-traditional funders like China. The paper argues for a move from prescriptive standards to results-based implementation, recommending country-specific 'E&S safeguards plans,' enhanced regional capacity building, and a greater role for national development finance institutions (DFIs).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Research paper
A Dwindling Role for Coal
The report evaluates the US coal fleet's economic viability against alternatives like natural gas and renewables, finding that 38% of the 2016 fleet faces an uncertain near-term future due to being either uneconomic or announced for retirement. It also estimates that emissions reductions from 2008 to 2016 provided $250 billion in public health and climate benefits. A proximity analysis indicates that while many coal plants are located in low-income and minority communities, the demographic distribution of the fleet has not changed significantly during the transition.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Committing to Renewables in New Mexico
The Union of Concerned Scientists argues that New Mexico should strengthen its renewable portfolio standard (RPS) to 80 percent by 2040 to ensure a cost-effective transition from coal to clean energy. Modeling shows that renewables are the most economically favorable choice, offering significant capital investment, job growth, and public health benefits without substantially increasing consumer electricity costs. The report warns against utility plans to overinvest in natural gas, which could lead to stranded assets and higher climate risks.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
UPDATE ON THE PREFERRED BIDDERS UNDER THE FIRST BID WINDOW OF THE COAL BASELOAD IPP PROCUREMENT PROGRAMME AND THE PROPOSED KIPOWER COAL-FIRED POWER STATION
The Centre for Environmental Rights (CER) informs the South African Department of Energy that the Thabametsi and Khanyisa coal-fired power stations, both preferred bidders under the Coal Baseload IPP Procurement Programme (CBIPPPP), and the proposed KiPower station do not meet the legal qualification criteria for financial close. The CER highlights that a North Gauteng High Court ruling established that a full climate change impact assessment (CCIA) is a necessary part of the environmental impact assessment (EIA) for coal-fired plants. Thabametsi's CCIA indicated the plant would be one of the highest greenhouse gas emitters in the country and faces high water availability risks. Khanyisa and KiPower have failed to conduct CCIAs. The letter also notes that these projects are located in the water-stressed Olifants River Catchment and the Highveld Priority Area, where air quality is out of compliance with health standards. The CER requests clarification on whether the financial close deadline has been suspended pending the updated Integrated Resource Plan (IRP) and Integrated Energy Plan (IEP).
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
THE DEVELOPMENT BANK OF SOUTHERN AFRICA’S ROLE IN THE FINANCING OF THE PROPOSED THABAMETSI COAL-FIRED POWER PLANT
The Centre for Environmental Rights (CER) has challenged the Development Bank of Southern Africa's (DBSA) financing of the Thabametsi coal-fired power plant. The CER highlights a March 2017 North Gauteng High Court ruling that suspended the project's environmental authorisation because climate change impacts were not adequately considered. The CER notes that Thabametsi's own assessments indicate it would be one of South Africa's highest greenhouse gas emitters and faces high water availability risks. The document argues that financing new coal projects contradicts the DBSA's stated goals of supporting a low-carbon economy and its status as a UN Green Climate Fund entity, warning that the plant is likely to become a stranded asset given South Africa's commitments under the Paris Agreement.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
CSIRS COMPREHENSIVE ALTERNATIVE INTEGRATED RESOURCE PLAN (IRP) FOR ELECTRICITY: MISSING COSTS
The Centre for Environmental Rights (CER), on behalf of the Life After Coal Campaign, asserts that the CSIR's alternative IRP and the DoE's draft IRP omit substantial externalities associated with coal and nuclear energy. The letter highlights an estimated R33 billion annual economic cost from air pollution due to coal-fired generation and argues that water consumption figures are underestimated or based on inaccurate data. It further notes that the circulating fluidised bed combustion technology planned for the Thabametsi power station results in significant nitrous oxide emissions, making it 60% worse in GHG emission intensity than the Medupi and Kusile stations. Finally, the CER demands the inclusion of nuclear decommissioning, fuel storage, and insurance costs to ensure a fair assessment of energy options.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Thabametsi Power Station Limpopo Province Final Climate Change Study and Palaeontological Impact Assessment
The document is a 'Comments and Responses Report' addressing objections to the Thabametsi Power Station's climate and palaeontological assessments. The developer, Thabametsi Power Company, defends the project's alignment with the 2010 Integrated Resource Plan (IRP) and argues that its greenhouse gas (GHG) emissions, while high, are consistent with international standards and comparable to other South African coal plants. It rejects claims that it must calculate the 'social cost of carbon' or assess community-level climate resilience, stating these fall outside the approved Scope of Work. The report also addresses water scarcity risks in the Lephalale region, asserting that Phase 1 will use existing water allocations from the MCWAP-1 scheme and employ dry-cooling technology to minimize consumption.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Whittling Away the Health and Climate Benefits from a Canada-Wide Coal Plant Phase-0ut?
The Canadian Association of Physicians for the Environment (CAPE) urges the Federal Minister of Environment and Climate Change to ensure the 2030 coal-fired power plant phase-out is not undermined by a reliance on natural gas. CAPE recommends amending regulations to shorten the 'useful life' of coal generators to 40 years, enforcing stricter emission rates for gas plants, and requiring that at least two-thirds of generation be replaced with renewable energy. The organization highlights that a successful phase-out could prevent 1,000 premature deaths and 900 hospital visits while reducing greenhouse gases by up to 325 Mt between 2015 and 2035.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Thabametsi Power Station Limpopo Province Climate Change Study and Palaeontological Impact Assessment
The report evaluates the Thabametsi Power Station's impact on climate change and palaeontological heritage. It finds that the plant will have a 'High (Negative)' impact due to 'Very Large' annual GHG emissions of approximately 9.88 million t CO2e. While the plant's emissions intensity is slightly lower than some older Eskom plants slated for decommissioning, it remains high. The climate resilience assessment identifies water shortages and quality as high risks. The palaeontological assessment finds a medium risk of impact in the Swartrant Formation and low risk elsewhere, recommending monitoring by a palaeontologist during excavations.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
REQUEST FOR MEETING TO DISCUSS WAY FORWARD ON ESKOM’S NON-COMPLIANCE WITH EMISSION STANDARDS
The Centre for Environmental Rights (CER) is calling for a meeting with the Department of Environmental Affairs to address evidence of widespread non-compliance by Eskom power stations with their atmospheric emission licences (AELs). Based on a report by Professor Eugene Cairncross analyzing data from 1 April 2015 to 31 March 2016, the CER identifies multiple stations likely exceeding PM10, NOx, and SO2 limits. The CER argues that Eskom is the largest emitter in the Highveld Priority Area and recommends stricter reporting requirements, including the use of daily average concentrations rather than monthly aggregates, to accurately monitor compliance.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Politics & Global Warming
The report finds that while a majority of US registered voters believe global warming is happening and support various clean energy policies, there is a significant gap between their stated willingness to advocate for climate action and their actual behavior. Political polarization remains evident, with conservative Republicans showing the lowest levels of concern and support for regulatory measures, although they still support renewable energy research and tax rebates for energy-efficient products.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
APPEAL TO THE MINISTER OF ENVIRONMENTAL AFFAIRS
This document is a legal submission by groundWork, represented by the Centre for Environmental Rights, appealing to the Minister of Environmental Affairs to extend the deadline for filing an appeal against the environmental authorisation of the ACWA Power Khanyisa Thermal Power Station. The appellant argues that the authorisation is unlawful because it lacked a comprehensive climate change impact assessment, a requirement recently affirmed by the High Court in the Thabametsi judgment.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
IMPLICATIONS OF THE JUDGMENT IN EARTHLIFE AFRICA JOHANNESBURG V MINISTER OF ENVIRONMENTAL AFFAIRS AND OTHERS CASE NO 65662/16
The Centre for Environmental Rights informs the South African Department of Environmental Affairs that a court ruling now requires climate change impact assessments (CCIA) as part of environmental impact assessments (EIA) for coal-fired power stations. The document outlines the minimum requirements for a CCIA, warns that existing authorizations without such assessments may be legally vulnerable, and urges the Department to establish formal guidelines for conducting these assessments.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
UK support for pollution controls on coal power plants
A joint letter from NGOs to the UK Secretary of State for Environment, Food & Rural Affairs, arguing that supporting the revised LCP BREF is essential for public health and environmental protection. The authors highlight that the new standards would significantly reduce premature deaths and health costs in Europe, while complementing the UK's domestic coal phase-out goals.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement