Search Climate Insights Directory
3 results
SUBMISSIONS ON ESKOM’S APPLICATION FOR SUSPENSION, ALTERNATIVE LIMITS AND/OR POSTPONEMENT OF COMPLIANCE WITH THE MINIMUM EMISSION STANDARDS FOR 10 OF ITS COAL-FIRED POWER STATIONS
The Life After Coal campaign, led by the Centre for Environmental Rights (CER), formally objects to Eskom's application for the suspension, postponement, or alternative limits of Minimum Emission Standards (MES) for 10 coal-fired power stations. The submission argues that Eskom fails to meet the legal prerequisites of the 2017 National Framework for Air Quality Management, specifically regarding National Ambient Air Quality Standards (NAAQS) compliance and the prevention of direct adverse health impacts.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Potential Risks to Water Resources from the Proposed Thabametsi Power Plant
This report evaluates the potential risks to water resources posed by the proposed Thabametsi Power Plant's coal ash dump and pollution control dams. The author concludes that the chosen site is unsuitable and the proposed mitigation measures are insufficient to protect groundwater, surface water, and wetlands.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
record-6.1-to-6.2-b073b68dae94a8ee.pdf
This document is an executive summary and board submission from Eskom dated August 28, 2013, regarding compliance with South Africa's National Emission Standards and Atmospheric Emission Licences (AELs). It outlines the financial and operational impossibility of full compliance by 2020, proposes a partial compliance strategy, and requests permission to continue operating several power stations that are currently in breach of their emission limits.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Executive summary