Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report details Namibia's ambitious push to become a global leader in green hydrogen, highlighted by the selection of Hyphen Hydrogen Energy for a US$9.4 billion project. However, it warns that the project relies on untested technology at scale and an opaque selection process.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Namibia aims to establish a green hydrogen and ammonia industry to become a world leader in a new global industry, moving beyond the typical pattern of developing countries as technology followers.
  • The Namibian government has implemented a structured roadmap for the industry, including the creation of an Inter-Ministerial Green Hydrogen Committee in the first quarter of the 2021/22 financial year, a National Green Hydrogen and Ammonia Strategy by the end of the third quarter of the same year, and a feasibility study to be completed by 2023.
  • Hyphen Hydrogen Energy was selected as the preferred bidder for a vertically integrated green hydrogen project in Tsau //Khaeb national park, with a total planned investment of US$9.4 billion.
  • The Hyphen project is planned in phases: the first phase, expected to start production in 2026, involves 2GW of renewable electricity capacity for green ammonia production at a cost of US$4.4 billion, eventually expanding to 5GW of renewable generation and 3GW of electrolyser capacity.
  • The Hyphen project is expected to create nearly 15,000 direct jobs during its four-year construction phase and 3,000 permanent jobs during operation, with over 90% of these roles intended for Namibians.
  • Namibia is positioned as one of the five lowest-cost producers of green hydrogen globally, with McKinsey estimating production costs could reach US$1.5/kg by 2030, compared to US$4-5.5/kg in 2020.
  • The report identifies significant risks to the industry, including the use of technology at an untested scale, a lack of domestic industry expertise requiring imports, and an opaque selection process for the preferred bidder.

Cite the original document

APA
Institute for Public Policy Research (2021). Namibia Quarterly Economic Review. https://ippr.org.na/wp-content/uploads/2022/01/Namibia-QER-2021-Q4-final-1.pdf
Chicago
Institute for Public Policy Research. Namibia Quarterly Economic Review. 2021. https://ippr.org.na/wp-content/uploads/2022/01/Namibia-QER-2021-Q4-final-1.pdf.
Wikipedia
{{cite report |author=Institute for Public Policy Research |title=Namibia Quarterly Economic Review |date=2021 |url=https://ippr.org.na/wp-content/uploads/2022/01/Namibia-QER-2021-Q4-final-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ipprna-000231)}}
BibTeX
@techreport{instituteforpublicpolicyresearch2021namibia, author = {{Institute for Public Policy Research}}, title = {{Namibia Quarterly Economic Review}}, institution = {Institute for Public Policy Research}, year = {2021}, url = {https://ippr.org.na/wp-content/uploads/2022/01/Namibia-QER-2021-Q4-final-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ipprna-000231} }

Full text

Collected · Record updated