Examining Cracks in Emerging Asia’s LNG-to-Power Value Chain
Summary
The report finds that 62% of proposed LNG terminal investments and 66% of gas-fired power plant projects across seven emerging Asian countries are unlikely to be built due to macroeconomic and financial risks.
Key insights
- Across the seven countries studied, IEEFA estimates that 62% of proposed LNG import terminal capacity and 61% of gas-fired power capacity are unlikely to be viable. When commercial project finance lending constraints are included, an additional 5% of power projects are unlikely to secure financing, leaving a total feasible capacity of 52.6mtpa for terminals and 33.2GW for gas-fired power.
- In Vietnam, only 22% of total proposed LNG investments are considered viable, including 9mtpa of terminal projects and 10.83GW of power projects. Risks include competition with renewables and coal, a lack of a common gas pricing regime, and new laws that limit public guarantees.
- Thailand has a higher viability rate with 64% of proposed investments potentially feasible, including 15.5mtpa of terminal capacity and 15.9GW of power capacity. However, reliance on US dollar-denominated LNG could harm the economy, and renewables deployment may limit long-term take-or-pay contracts.
- In the Philippines, only 29% of proposed LNG investments are viable (6.3mtpa terminal and 2.9GW power capacity), hindered by limited contractual opportunities for power plants and evolving legal regimes that create uncertainty for cost recovery.
- Cambodia and Myanmar show very low viability: only 11% of proposed LNG investments in Cambodia and 14% in Myanmar (pre-coup pipeline) are considered feasible. In Cambodia, risks include sub-investment grade credit ratings and grid constraints; in Myanmar, current military rule is expected to prevent major projects from proceeding.
- Pakistan has the highest viability rate at 98% (18.8mtpa terminal and 1.3GW power capacity) because several projects have already reached financial close or received permissions. However, the primary risk is the country's ability to afford cargoes, exacerbated by gas and power underpricing and circular debt.
- In Bangladesh, 33% of total LNG investments are feasible (3.8mtpa terminal and 3.1GW power capacity). Key risks include rising subsidies that increase default risks, regulatory instability, and generation overcapacity.
Cite the original document
- APA
- Reynolds, S., & Hauber, G. (2021). Examining Cracks in Emerging Asia’s LNG-to-Power Value Chain. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2021/12/IEEFA-Media-Brief-Emerging-Asia-LNG-Projects.pdf
- Chicago
- Reynolds, Sam, and Grant Hauber. Examining Cracks in Emerging Asia’s LNG-to-Power Value Chain. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/wp-content/uploads/2021/12/IEEFA-Media-Brief-Emerging-Asia-LNG-Projects.pdf.
- Wikipedia
- {{cite report |last1=Reynolds |first1=Sam |last2=Hauber |first2=Grant |title=Examining Cracks in Emerging Asia’s LNG-to-Power Value Chain |publisher=Institute for Energy Economics and Financial Analysis |date=December 2021 |url=https://ieefa.org/wp-content/uploads/2021/12/IEEFA-Media-Brief-Emerging-Asia-LNG-Projects.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001517)}}
- BibTeX
- @techreport{reynolds2021examining, author = {Reynolds, Sam and Hauber, Grant}, title = {{Examining Cracks in Emerging Asia’s LNG-to-Power Value Chain}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = dec, url = {https://ieefa.org/wp-content/uploads/2021/12/IEEFA-Media-Brief-Emerging-Asia-LNG-Projects.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001517} }
Full text
Collected · Record updated