The report finds that early retirement of the Sahiwal Coal-Fired Power Plant is economically viable with compensation between USD 0.4 billion and 1.5 billion, which is significantly cheaper than the USD 5 billion in capacity payments due through 2046.
Key insights
- The Sahiwal Coal-Fired Power Plant (CFPP) is a prime candidate for early retirement because its utilization has dropped below 20% due to stagnant industrial demand and the rise of distributed solar, while its debt amortization is nearly complete.
- Early retirement of Sahiwal CFPP is economically viable within a compensation range of USD 0.4 billion to 1.5 billion. A 10-year acceleration of closure by 2036 would cost between USD 48 million and 59 million, compared to USD 5 billion in continued capacity payments through 2046.
- Two primary pathways for retirement are identified: an upfront buyout to compensate owners for foregone cash flows, or a negotiated reduction in the Return on Equity (ROE) to accelerate the achievement of equity value.
- A 'coal-to-clean' reinvestment model could use the USD 59 million required for a 10-year retirement acceleration as anchor equity for a 280MW hybrid project (51MW solar, 197MW wind, and 31MW BESS) costing approximately USD 300 million.
- Reducing the ROE by 0.5% could shave six years off the plant's technical lifetime, while a reduction of 2% to 3% could extend this reduction to 11 years.
- Early retirement of Sahiwal CFPP could avoid 27 to 38 million tonnes of carbon dioxide emissions over a 10-year reduction scenario, with total avoided emissions across various scenarios ranging from 13 to 65 million tonnes.
- Pakistan's coal phaseout is hindered by a young fleet (average age 4.8 years), sovereign guarantees, long-term take-or-pay contracts, and macroeconomic instability that limits the government's fiscal capacity.
- China's Green Investment and Finance Partnership (GIFP) presents an opportunity for China to lead a coal retirement pilot in Pakistan, potentially using policy banks to refinance loans at concessional rates.
- Significant financial arrears are a major barrier to negotiations; for example, the Sahiwal CFPP has outstanding receivables exceeding PKR 82.7 billion.
Cite the original document
- APA
- Isaad, H., Sayed, M. H., Ahmad, A., & Muhammad, U. F. (n.d.). Repurposing Pakistan’s coal-based assets. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-12/IEEFA%20-%20Repurposing%20Pakistan%27s%20coal-based%20assets.pdf
- Chicago
- Isaad, Haneea, Mustafa Hyder Sayed, Ahtasam Ahmad, and Umar Farooq Muhammad. Repurposing Pakistan’s coal-based assets. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2025-12/IEEFA%20-%20Repurposing%20Pakistan%27s%20coal-based%20assets.pdf.
- Wikipedia
- {{cite report |last1=Isaad |first1=Haneea |last2=Sayed |first2=Mustafa Hyder |last3=Ahmad |first3=Ahtasam |last4=Muhammad |first4=Umar Farooq |title=Repurposing Pakistan’s coal-based assets |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2025-12/IEEFA%20-%20Repurposing%20Pakistan%27s%20coal-based%20assets.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001325)}}
- BibTeX
- @techreport{isaadndrepurposing, author = {Isaad, Haneea and Sayed, Mustafa Hyder and Ahmad, Ahtasam and Muhammad, Umar Farooq}, title = {{Repurposing Pakistan’s coal-based assets}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-12/IEEFA%20-%20Repurposing%20Pakistan%27s%20coal-based%20assets.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001325} }
Full text
Collected · Record updated