Choosing the right incentive for Pakistan’s renewable energy industry

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that Pakistan's transition to competitive bidding for renewable energy has failed due to unrealistic benchmark tariffs and high investor risk, recommending an optimum solar benchmark tariff range of 4.3-5.8 USc/KWh.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The 600 MW solar power project at Muzaffargarh received no bids, which the author attributes to a high-risk investment environment and a benchmark tariff of 3.4108 USc/KWh that was considered too low given rising international and domestic interest rates.
  • IEEFA's assessment suggests that the optimum benchmark tariff for solar power in Pakistan should range between 4.3 and 5.8 USc/KWh, depending on the financing structure used.
  • Renewable energy additions in Pakistan were primarily driven by upfront (feed-in) and cost-plus tariff regimes, both of which were discontinued in 2016 to make way for competitive bidding.
  • The transition to competitive bidding has been hindered by a nearly five-year delay in announcing framework guidelines and a lack of coordination between the Alternative Energy Development Board (AEDB) and the National Transmission and Despatch Company (NTDC) regarding grid capacity.
  • Investor confidence is severely dampened by the financial instability of the Central Power Purchasing Authority (CPPA), the sole off-taker, which has failed to pay independent power producers (IPPs) on time despite sovereign guarantees.
  • The Pakistani renewable energy market is considered immature, with learning rates of only 1% for solar and 0.3% for wind, indicating that tariff reductions have been driven by global technology costs rather than local market development.
  • To de-risk the market and avoid locking in high costs, the report recommends reducing the duration of power purchase agreements (PPAs) by 5-10 years, potentially moving toward 15-year contracts.

Cite the original document

APA
Isaad, H. (n.d.). Choosing the right incentive for Pakistan’s renewable energy industry. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-06/Choosing%20the%20right%20incentive%20for%20Pakistan%27s%20renewable%20energy%20industry_20230616.pdf
Chicago
Isaad, Haneea. Choosing the right incentive for Pakistan’s renewable energy industry. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2023-06/Choosing%20the%20right%20incentive%20for%20Pakistan%27s%20renewable%20energy%20industry_20230616.pdf.
Wikipedia
{{cite report |last1=Isaad |first1=Haneea |title=Choosing the right incentive for Pakistan’s renewable energy industry |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2023-06/Choosing%20the%20right%20incentive%20for%20Pakistan%27s%20renewable%20energy%20industry_20230616.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001092)}}
BibTeX
@techreport{isaadndchoosing, author = {Isaad, Haneea}, title = {{Choosing the right incentive for Pakistan’s renewable energy industry}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2023-06/Choosing%20the%20right%20incentive%20for%20Pakistan%27s%20renewable%20energy%20industry_20230616.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001092} }

Full text

Collected · Record updated