SETTING SAIL: EU PRIORITIES TO DELIVER NORTH SEAS OFFSHORE WIND

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines the economic and environmental benefits of moving from radial offshore wind connections to a meshed, integrated grid in the North Seas. It recommends using EU regulations (TEN-E and RED) to mandate cooperation, involving the European Scientific Advisory Board on Climate Change for science-based planning, and establishing a political commitment with the UK for a hybrid interconnector operational by 2029.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Strategic coordination of offshore wind connections through offshore hubs and a meshed grid could generate estimated savings of €30-60bn by 2050 compared to independent national networks.
  • The highest cost savings are achieved through a fully interconnected offshore grid rather than separate grids in individual territorial waters; in a medium ambition scenario, this provides an additional saving of €32bn, and €29bn in a high ambition scenario.
  • The EU's strategy for offshore renewable energy aims to increase offshore wind capacity from 12GW to at least 60GW by 2030 and 300GW by 2050.
  • To optimize green hydrogen production from offshore wind, the preferred approach is the co-location of electrolysis and generation where existing gas network infrastructure can be repurposed for transport, as building additional power networks is costly (€44bn in medium and €166bn in high ambition scenarios).
  • The EU and UK should establish a political commitment by the end of 2021 to develop a 'hybrid interconnector' connecting windfarms in both territories, with a target to be operational before the end of 2029.
  • The document recommends that the European Scientific Advisory Board on Climate Change provide independent, science-based advice on the assumptions used for network planning to ensure alignment with the climate neutrality pathway.

Cite the original document

APA
SKILLINGS, S., & FISCHER, L. (2021). SETTING SAIL: EU PRIORITIES TO DELIVER NORTH SEAS OFFSHORE WIND. E3G. https://www.e3g.org/wp-content/uploads/EU-policy-priorities-for-offshore-wind-development-in-the-North-Sea.pdf
Chicago
SKILLINGS, SIMON, and LISA FISCHER. SETTING SAIL: EU PRIORITIES TO DELIVER NORTH SEAS OFFSHORE WIND. E3G, 2021. https://www.e3g.org/wp-content/uploads/EU-policy-priorities-for-offshore-wind-development-in-the-North-Sea.pdf.
Wikipedia
{{cite report |last1=SKILLINGS |first1=SIMON |last2=FISCHER |first2=LISA |title=SETTING SAIL: EU PRIORITIES TO DELIVER NORTH SEAS OFFSHORE WIND |publisher=E3G |date=July 2021 |url=https://www.e3g.org/wp-content/uploads/EU-policy-priorities-for-offshore-wind-development-in-the-North-Sea.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001175)}}
BibTeX
@techreport{skillings2021setting, author = {SKILLINGS, SIMON and FISCHER, LISA}, title = {{SETTING SAIL: EU PRIORITIES TO DELIVER NORTH SEAS OFFSHORE WIND}}, institution = {E3G}, year = {2021}, month = jul, url = {https://www.e3g.org/wp-content/uploads/EU-policy-priorities-for-offshore-wind-development-in-the-North-Sea.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001175} }

Full text

Collected · Record updated