UK Power Sector: Delivering a Sectoral Investment Roadmap
Summary
The report outlines a structured approach for the UK government to develop Sectoral Investment Roadmaps to bridge the gap between current and required low-carbon investment. It proposes a methodology based on fundamental analysis of finance, policy, and delivery gaps, alongside cross-sectoral interdependencies. Applying this to the GB power sector, the report finds that achieving clean power by 2030 requires an average annual CAPEX of £38.1 billion, creating a finance gap of £19.4 billion per annum compared to historical spending. While existing policies are largely deemed fit-for-purpose, the report argues for a significant scaling of policy ambition and the resolution of delivery gaps in supply chain capacity, planning processes, and grid constraints.
Key insights
- The UK faces a significant investment deficit compared to G7 peers, with companies investing 20% less than those in France, Germany, and the US since 2005, which has cost the economy 4% of GDP. To meet net zero targets, the Climate Change Committee (CCC) suggests low-carbon investment must scale to £50 billion annually, primarily from the private sector.
- The proposed methodology for Sectoral Investment Roadmaps involves a three-stage process: laying foundations (selecting decarbonisation pathways), building the roadmaps (conducting fundamental analysis on finance, policy, and enabling requirements), and monitoring impact. Roadmaps should be updated every three years to align with Spending Reviews, with annual light-touch updates.
- In the GB power sector, reaching clean power by 2030 requires an average annual CAPEX of £38.1 billion. Compared to a historical average spend of £18.7 billion per annum (2021-2023), this results in a finance gap of £19.4 billion per annum, most of which is expected to be met by private finance, except for nuclear technology.
- Analysis of the power sector indicates that while existing policies are generally 'fit-for-purpose', a 'step change' in ambition is required. Significant budget scaling is recommended for several technologies to bridge gaps to 2030, including offshore wind (£51bn), onshore wind (£28bn), the offshore network (£17bn), Gas CCS (£11bn), and nuclear (£10bn).
- Critical delivery gaps in the power sector include a massive grid connection queue of 744 GW and slow planning processes. Supply chain capacity is also a risk, particularly for turbines and cables; turbine CAPEX is projected to average £6.7 billion per annum, an increase of £4.3 billion over historical spend.
- Public funding should be strategically targeted to de-risk early-stage technologies to attract private capital. Key instruments include GB Energy, backed by up to £8.3 billion, and the National Wealth Fund (NWF) with a total capitalisation of £27.8 billion, which aims for a portfolio mobilisation ratio of 1:3 to catalyse private investment.
Cite the original document
- APA
- E3G (2025). UK Power Sector: Delivering a Sectoral Investment Roadmap. https://www.e3g.org/wp-content/uploads/E3G_Power-Systems-Investment-Roadmap_Report_FINAL.pdf
- Chicago
- E3G. UK Power Sector: Delivering a Sectoral Investment Roadmap. 2025. https://www.e3g.org/wp-content/uploads/E3G_Power-Systems-Investment-Roadmap_Report_FINAL.pdf.
- Wikipedia
- {{cite report |author=E3G |title=UK Power Sector: Delivering a Sectoral Investment Roadmap |date=August 2025 |url=https://www.e3g.org/wp-content/uploads/E3G_Power-Systems-Investment-Roadmap_Report_FINAL.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001131)}}
- BibTeX
- @techreport{e3g2025power, author = {{E3G}}, title = {{UK Power Sector: Delivering a Sectoral Investment Roadmap}}, institution = {E3G}, year = {2025}, month = aug, url = {https://www.e3g.org/wp-content/uploads/E3G_Power-Systems-Investment-Roadmap_Report_FINAL.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001131} }
Full text