The report assesses PIDA's priority dam projects, finding that most are economically unviable, carry high financial and social risks, and prioritize industrial export over local energy access. It recommends a shift toward diversified renewable energy and robust options assessments.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • PIDA's power projects frequently prioritize the needs of extractive industries and export markets over local energy access for African citizens.
  • The proposed dams pose severe risks to river systems and dependent communities; for example, the Fomi Dam in Guinea could devastate the Inner Niger Delta wetlands in Mali, affecting over one million people.
  • Large-scale displacement is a significant consequence of these projects, with the eleven assessed dams expected to displace between 90,000 and 100,000 people.
  • Many PIDA projects rely on outdated designs from over two decades ago and have not been updated to include modern clean energy technologies or comprehensive options assessments.
  • Climate change presents a substantial risk to the reliability of these hydropower projects, particularly in the Nile, Zambezi, and Senegal river basins.
  • High levels of corruption in host countries increase the risk of cost overruns and reduced construction quality, with many projects lacking corruption-monitoring mechanisms.
  • The Kaleta Dam in Guinea was the only project among the 11 assessed to receive 'least concerning' scores across all evaluation criteria, noted for its positive NPV and efforts to prioritize local employment.
  • The Inga 3 project in the DRC is characterized as very high-risk due to its massive $14 billion cost, which nearly equals the country's annual GDP, and a poor track record of resettlement and maintenance at Inga 1 and 2.

Cite the original document

APA
Sanyanga, R. A., Asanzi, A., Mdone, E., Klemm, J., & Greenstein, G. (n.d.). Right Priorities for Africa’s Power Sector. Heinrich Böll Stiftung Southern Africa. https://za.boell.org/sites/default/files/pida_report_-_final_web_version.pdf
Chicago
Sanyanga, Rudo A, Ange Asanzi, Erskine Mdone, Josh Klemm, and Gus Greenstein. Right Priorities for Africa’s Power Sector. Heinrich Böll Stiftung Southern Africa, n.d. https://za.boell.org/sites/default/files/pida_report_-_final_web_version.pdf.
Wikipedia
{{cite report |last1=Sanyanga |first1=Rudo A |last2=Asanzi |first2=Ange |last3=Mdone |first3=Erskine |last4=Klemm |first4=Josh |last5=Greenstein |first5=Gus |title=Right Priorities for Africa’s Power Sector |publisher=Heinrich Böll Stiftung Southern Africa |url=https://za.boell.org/sites/default/files/pida_report_-_final_web_version.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document boellza-000156)}}
BibTeX
@techreport{sanyangandright, author = {Sanyanga, Rudo A and Asanzi, Ange and Mdone, Erskine and Klemm, Josh and Greenstein, Gus}, title = {{Right Priorities for Africa’s Power Sector}}, institution = {Heinrich Böll Stiftung Southern Africa}, url = {https://za.boell.org/sites/default/files/pida_report_-_final_web_version.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document boellza-000156} }

Full text

Collected · Record updated