Mining more value: Assessing the fiscal and environmental implications of the Erdenet smelter project
Summary
The report finds that while a copper smelter at Erdenet would increase domestic value addition, it would reduce the project's overall net present value (NPV) compared to continuing concentrate exports. A stand-alone tolling smelter is deemed commercially unviable. The analysis emphasizes that sulfur dioxide management and sulfuric acid utilization are critical environmental and economic drivers. It recommends greater transparency regarding feasibility studies and environmental impact assessments to ensure informed public debate and alignment with international ESG standards.
Key insights
- An integrated mine-and-smelter operation is financially viable but generates a lower net present value (NPV) than continuing to export copper concentrate. The integrated scenario's NPV is USD 106.7 million, whereas the mine-only scenario's NPV is USD 152.3 million, as higher revenues from processing are offset by increased capital and operating costs.
- A stand-alone tolling smelter is not commercially viable under the tested assumptions. The facility would generate approximately USD 3.4 billion in revenue from treatment and refining charges, which is insufficient to cover USD 9.0 billion in operating costs and USD 2.4 billion in capital expenditure.
- The economic viability of the smelter is heavily dependent on the ability to market sulfuric acid, a by-product of smelting. While increasing the share of acid sold from 20% to 100% improves the integrated project's NPV and government take, it still does not make the project more profitable than the mine-only scenario.
- Sulfur dioxide (SO2) management is the primary environmental challenge. Modern international standards require capture rates exceeding 99%, and the report notes that the proposed project's specific capture rate and the full Detailed Environmental Impact Assessment (DEIA) have not been fully disclosed to the public.
- The Government of Mongolia's current fiscal reliance on mineral royalties may reduce overall government revenue by lowering project profitability, which in turn reduces corporate income tax and dividend payments.
- The project's financial performance is most sensitive to copper prices, which show a strong positive Pearson correlation of 87.2% with project value. Real operating cost escalation has a moderate negative correlation of -42.6%.
- The Government of Mongolia selected China Nonferrous Metal Industry’s Foreign Engineering and Construction Co. Ltd (NFC) as the strategic partner for the smelter in June 2026, intending to use SKS bottom-blown smelting technology developed in China.
Cite the original document
- APA
- Namkhaijantsan, D., & Naranbaatar, Z. (2026). Mining more value: Assessing the fiscal and environmental implications of the Erdenet smelter project. Natural Resource Governance Institute. https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report_en.pdf
- Chicago
- Namkhaijantsan, Dorjdari, and Zoljargal Naranbaatar. Mining more value: Assessing the fiscal and environmental implications of the Erdenet smelter project. Natural Resource Governance Institute, 2026. https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report_en.pdf.
- Wikipedia
- {{cite report |last1=Namkhaijantsan |first1=Dorjdari |last2=Naranbaatar |first2=Zoljargal |title=Mining more value: Assessing the fiscal and environmental implications of the Erdenet smelter project |publisher=Natural Resource Governance Institute |date=September 2026 |url=https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report_en.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document NRGI-000572)}}
- BibTeX
- @techreport{namkhaijantsan2026mining, author = {Namkhaijantsan, Dorjdari and Naranbaatar, Zoljargal}, title = {{Mining more value: Assessing the fiscal and environmental implications of the Erdenet smelter project}}, institution = {Natural Resource Governance Institute}, year = {2026}, month = sep, url = {https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report_en.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document NRGI-000572} }
Full text
Collected · Record updated