OBJECTIONS TO THE WATER USE LICENCE APPLICATION FOR THE PROPOSED MOKOLO CROCODILE RIVER (WEST) WATER AUGMENTATION PROJECT PHASE2A (MCWAP-2A)
The Centre for Environmental Rights (CER), on behalf of Earthlife Africa and groundWork, submitted formal objections on 14 June 2022 to the Integrated Water Use Licence Application (IWULA) for Phase 2A of the Mokolo Crocodile River (West) Water Augmentation Project (MCWAP-2A). The CER argues that the project is an unnecessary inter-basin transfer designed to support coal expansion, which contradicts South Africa's climate commitments and poses severe risks to aquatic ecosystems and local communities.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
APPEAL IN TERMS OF SECTION 43 OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT,1998 AGAINST THE ENVIRONMENTAL AUTHORISATION ISSUED TO THE DEPARTMENT OF WATER AND SANITATION ON 15 MARCH 2019 FOR THE MOKOLO AND CROCODILE RIVER (WEST) AUGMENTATION PROJECT (PHASE 2A) (MCWAP-2A), WITHIN THE THABAZIMBI AND LEPHALALE LOCAL MUNICIPALITIES IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE
This document is a formal appeal submitted by the Centre for Environmental Rights on behalf of Earthlife Africa and groundWork to the Minister of Environmental Affairs. The appeal seeks to set aside an Environmental Authorisation granted on 15 March 2019 to the Department of Water and Sanitation for Phase 2A of the Mokolo and Crocodile River (West) Augmentation Project (MCWAP-2A). The appellants argue that the project is unnecessary, environmentally damaging, and based on outdated energy demand assumptions.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Statement
Brief Review of the MCWAP Phase 2A Draft Environmental Impact Assessment Report (September 2018), and Baseline Aquatic and Wetland Impact Specialist Reports
The Freshwater Research Centre (FRC) reviewed the MCWAP Phase 2A Draft Environmental Impact Assessment Report (DEIR) and found it inadequate in its assessment of operational phase impacts on rivers and wetlands. Key criticisms include the failure to account for cumulative climate change risks, the lack of consultation with neighbouring states in the Limpopo River Basin, and the use of a risk matrix that does not assess the significance of impacts as required by NEMA. The FRC highlights significant risks regarding the transfer of poor-quality water and invasive species, such as Water Hyacinth, from the donor Crocodile (West) River and Hartbeespoort Dam to the recipient Matlabas and Mokolo River catchments.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report