Search Climate Insights Directory
1 result
DateDocumentOrganization and type
Countdown to Shutdown
The document details the use of the RESOLVE model and the Clean System Power Calculator to evaluate seven scenarios regarding the retirement of the Diablo Canyon nuclear power plant. It focuses on three global warming emissions targets (46 MMT, 38 MMT, and 30 MMT) by 2030 and compares the effects of a 2025 shutdown versus a 20-year extension to 2045. The analysis specifically aims to estimate the resources needed to replace nuclear capacity without increasing emissions and to calculate the resulting differences in nitrogen oxides (NOx) emissions.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Showing 1–1 of 1 document