Search Climate Insights Directory

Search syntax
intitle:
The document title intitle:"climate education"
ispublisher:
The publishing organization ispublisher:CAPE
insummary:
Summary and key findings insummary:"conflict of interest"
hasconcept:
Climate tags, frame/perspective and analysis type hasconcept:"Climate Justice"
geography:
Regions the document covers or discusses geography:Canada
doctype:
Document type doctype:report
lang:
Document language, as an ISO code lang:fr
cidid:
One record, by its directory id cidid:iisd-000297
Analysis TypeLegal and regulatory review
Clear all

2 results

  • The Life After Coal Campaign opposes Eskom's plan to install temporary bypass stacks at the Kusile power station, which would allow unabated SO2 emissions to restore generating capacity. The campaign argues that this proposal poses grave risks to human health, potentially causing up to 1,362 air pollution-related deaths and R25 billion in societal costs over 36 months at high utilization. They challenge the claim that the bypass will restore 2,160 MW, noting the plant's historical 33% capacity performance. Instead of the bypass, the campaign proposes investing the funds into solar PV and wind installations to accelerate the coal phase-out.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Statement

  • The report examines the Brazil's Federal Court of Accounts (TCU) as a key entity for risk management and preventive audits in federal land transport infrastructure. It finds that the TCU often becomes the primary body for approving Technical, Economical and Environmental Feasibility Studies (EVTEA), but typically does so too late in the project life cycle, leading to inefficiencies and wasted public resources. Through case studies of the BR-163/230/MT/PA highway, the North-South Railway (FNSTC), the South Integration Highway (RIS), and Ferrogrão, the document illustrates the TCU's role in defining environmental responsibilities and identifying flaws in feasibility studies, while maintaining a boundary that avoids infringing on the Executive Branch's discretionary power.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Report

    Regions: Brazil
Showing 1–2 of 2 documents