Plane fur deutsche flussigerdgas-terminals sind massiv uberdimensioniert

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The NewClimate Institute asserts that Germany's planned LNG terminals are not necessary to meet gas demand following the loss of Russian imports and would likely become stranded assets. The report suggests that current demand could be met through continued imports from neighboring countries and increased energy efficiency, warning that full implementation of the 11 planned terminals would jeopardize the 2045 climate neutrality goal and violate the Paris Agreement.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The 11 planned LNG terminals, with a total capacity of approximately 73 billion cubic meters per year, would allow for 50% more gas imports than were previously sourced from Russia, which stood at 46 billion cubic meters per year.
  • To reach the goal of climate neutrality by 2045, Germany must steadily reduce gas consumption: by approximately one-fifth by 2030, by half by 2035, and to nearly zero by 2045.
  • The planned terminals are considered oversized even if converted for green hydrogen or ammonia, as the demand for imported hydrogen in a climate-neutral Germany will be significantly lower than current gas demand.
  • Full utilization of the 11 planned terminals by 2030 would result in CO2 emissions from the combustion of imported natural gas alone accounting for one-third of the greenhouse gas emissions permitted under the target path, excluding emissions from extraction and transport.
  • The construction and operation of all planned terminals would conflict with the German Climate Protection Act and international obligations under the Paris Agreement.

Cite the original document

APA
NewClimate Institute (2022). Plane fur deutsche flussigerdgas-terminals sind massiv uberdimensioniert. https://newclimate.org/resources/publications/plane-fur-deutsche-flussigerdgas-terminals-sind-massiv-uberdimensioniert
Chicago
NewClimate Institute. Plane fur deutsche flussigerdgas-terminals sind massiv uberdimensioniert. 2022. https://newclimate.org/resources/publications/plane-fur-deutsche-flussigerdgas-terminals-sind-massiv-uberdimensioniert.
Wikipedia
{{cite report |author=NewClimate Institute |title=Plane fur deutsche flussigerdgas-terminals sind massiv uberdimensioniert |date=8 December 2022 |url=https://newclimate.org/resources/publications/plane-fur-deutsche-flussigerdgas-terminals-sind-massiv-uberdimensioniert |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{newclimateinstitute2022plane, author = {{NewClimate Institute}}, title = {{Plane fur deutsche flussigerdgas-terminals sind massiv uberdimensioniert}}, institution = {NewClimate Institute}, year = {2022}, month = dec, url = {https://newclimate.org/resources/publications/plane-fur-deutsche-flussigerdgas-terminals-sind-massiv-uberdimensioniert}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated