The Just Energy Transition Implementation Plan 2023–2027 establishes a coordinated framework across six key portfolios to transition South Africa to a low-carbon economy, requiring an estimated ZAR 1.5 trillion in investment.
Key insights
- The total financing requirement for the Just Energy Transition Investment Plan (JET IP) 2023–2027 is estimated at ZAR 1.5 trillion (approximately USD 85 billion) over five years.
- International financing pledges for the JET IP grew to USD 11.6 billion (approximately ZAR 198.2 billion) during 2023.
- The implementation is organized into six primary portfolios: Electricity, Mpumalanga Just Transition, New Energy Vehicles (NEVs), Green Hydrogen (GH2), Skills, and Municipalities.
- A moratorium on Eskom borrowing, a condition of the ZAR 254 billion debt relief package from National Treasury, has stalled the use of pledged concessional loans for transmission and decommissioning.
- The electricity sector requires approximately 6 GW of new renewable capacity annually over the five-year period, with an estimated total investment of ZAR 498 billion in solar, wind, and battery storage.
- South Africa faces a significant transmission infrastructure gap, requiring approximately 1,500 km of new lines annually over the next decade to accommodate renewable energy growth.
- The transition to New Energy Vehicles (NEVs) requires an estimated ZAR 128.1 billion from 2023–2027 to protect automotive manufacturing jobs and reduce transport emissions.
- The Mpumalanga province is most at risk from the transition, with an estimated 150,000 to 200,000 jobs at risk, including 80,000 coal miners.
- Municipalities are responsible for approximately half of the electricity distribution grid, with a total investment requirement of ZAR 273 billion for distribution maintenance and modernisation.
- The plan proposes a three-tier JET skills ecosystem consisting of a JET Desk in the DHET, a National JET Skills Advisory Forum, and three Skills Development Zones (SDZs) in Mpumalanga, Eastern Cape, and Northern Cape.
- The Accelerated Coal Transition Investment Plan (ACT IP) targets the phased closure and repurposing of the Hendrina, Grootvlei, and Camden power stations.
Cite the original document
- APA
- JUST SA (2023). Just Energy Transition Implementation Plan 2023–2027. https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf
- Chicago
- JUST SA. Just Energy Transition Implementation Plan 2023–2027. 2023. https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf.
- Wikipedia
- {{cite report |author=JUST SA |title=Just Energy Transition Implementation Plan 2023–2027 |date=2023 |url=https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document justsa-000017)}}
- BibTeX
- @techreport{justsa2023just, author = {{JUST SA}}, title = {{Just Energy Transition Implementation Plan 2023–2027}}, institution = {JUST SA}, year = {2023}, url = {https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document justsa-000017} }
Full text
Collected · Record updated