The Just Energy Transition Implementation Plan 2023–2027 establishes a coordinated framework across six key portfolios to transition South Africa to a low-carbon economy, requiring an estimated ZAR 1.5 trillion in investment.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The total financing requirement for the Just Energy Transition Investment Plan (JET IP) 2023–2027 is estimated at ZAR 1.5 trillion (approximately USD 85 billion) over five years.
  • International financing pledges for the JET IP grew to USD 11.6 billion (approximately ZAR 198.2 billion) during 2023.
  • The implementation is organized into six primary portfolios: Electricity, Mpumalanga Just Transition, New Energy Vehicles (NEVs), Green Hydrogen (GH2), Skills, and Municipalities.
  • A moratorium on Eskom borrowing, a condition of the ZAR 254 billion debt relief package from National Treasury, has stalled the use of pledged concessional loans for transmission and decommissioning.
  • The electricity sector requires approximately 6 GW of new renewable capacity annually over the five-year period, with an estimated total investment of ZAR 498 billion in solar, wind, and battery storage.
  • South Africa faces a significant transmission infrastructure gap, requiring approximately 1,500 km of new lines annually over the next decade to accommodate renewable energy growth.
  • The transition to New Energy Vehicles (NEVs) requires an estimated ZAR 128.1 billion from 2023–2027 to protect automotive manufacturing jobs and reduce transport emissions.
  • The Mpumalanga province is most at risk from the transition, with an estimated 150,000 to 200,000 jobs at risk, including 80,000 coal miners.
  • Municipalities are responsible for approximately half of the electricity distribution grid, with a total investment requirement of ZAR 273 billion for distribution maintenance and modernisation.
  • The plan proposes a three-tier JET skills ecosystem consisting of a JET Desk in the DHET, a National JET Skills Advisory Forum, and three Skills Development Zones (SDZs) in Mpumalanga, Eastern Cape, and Northern Cape.
  • The Accelerated Coal Transition Investment Plan (ACT IP) targets the phased closure and repurposing of the Hendrina, Grootvlei, and Camden power stations.

Cite the original document

APA
JUST SA (2023). Just Energy Transition Implementation Plan 2023–2027. https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf
Chicago
JUST SA. Just Energy Transition Implementation Plan 2023–2027. 2023. https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf.
Wikipedia
{{cite report |author=JUST SA |title=Just Energy Transition Implementation Plan 2023–2027 |date=2023 |url=https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document justsa-000017)}}
BibTeX
@techreport{justsa2023just, author = {{JUST SA}}, title = {{Just Energy Transition Implementation Plan 2023–2027}}, institution = {JUST SA}, year = {2023}, url = {https://www.justsaportal.org.za/uploads/files/JET-Implementation-Plan-2023-2027.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document justsa-000017} }

Full text

Collected · Record updated