Planning Power: Review of Electricity Policy in Namibia
Summary
The report finds that Namibia remains heavily dependent on electricity imports, primarily from South Africa, and recommends a balanced supply mix of conventional and renewable energy combined with aggressive demand-side management to ensure long-term energy security.
Key insights
- Namibia's internal electricity generation capacity has remained stagnant for approximately thirty years, with no new power generation facilities added to the grid in that period.
- The country failed to meet its 1998 White Paper on Energy Policy target of 75% energy self-sufficiency by 2010; local generation was only 48% in 2007/08.
- Namibia is heavily dependent on electricity imports, mainly from South Africa, which has historically provided cheap coal-fired power that made domestic generation projects appear uneconomical.
- Despite the existence of an Independent Power Producer (IPP) framework, no IPP power purchase agreements had been signed as of June 2009, leaving the sector dominated by the national utility NamPower.
- The establishment of Regional Electricity Distributors (REDs) has been incomplete, with only three of five planned REDs operational by June 2009, and has caused political tension as it reduced revenue for local authorities.
- Renewable energy potential in Namibia is significantly under-utilised due to high upfront costs, lack of awareness, and a lack of targeted financial incentives such as feed-in tariffs.
- Rural electrification remains a major challenge, with only about 17% of the rural population having access to electricity as of 2008; the report argues that complete electrification via the grid is economically prohibited.
- Demand-side management (DSM) measures, such as the distribution of compact fluorescent lights, have shown a low cost-to-benefit ratio and are essential for reducing peak demand and the need for new generation capacity.
- The Kudu gas-to-power project has been delayed for years due to challenges regarding gas pricing and the management of foreign exchange risks between US dollars and the Namibian currency.
- The Baynes hydroelectric project on the Kunene River is viewed as a critical potential source of base-load power, with an estimated capacity of 360 MW and an annual contribution of 1 TWh.
- The report recommends a balanced future supply mix that combines base-load power (hydro, gas, or coal) with diverse, smaller-scale renewable generators to ensure grid stability and reduce import dependence.
- To attract investment, Namibia needs to introduce cost-reflective tariffs by 2011/12 and implement specific tax breaks and incentives for new entrants and renewable energy enterprises.
Cite the original document
- APA
- Institute for Public Policy Research (2009). Planning Power: Review of Electricity Policy in Namibia. https://ippr.org.na/wp-content/uploads/2010/06/Review%20of%20Electricity%20Policy%20in%20Namibia.pdf
- Chicago
- Institute for Public Policy Research. Planning Power: Review of Electricity Policy in Namibia. 2009. https://ippr.org.na/wp-content/uploads/2010/06/Review%20of%20Electricity%20Policy%20in%20Namibia.pdf.
- Wikipedia
- {{cite report |author=Institute for Public Policy Research |title=Planning Power: Review of Electricity Policy in Namibia |date=2009 |url=https://ippr.org.na/wp-content/uploads/2010/06/Review%20of%20Electricity%20Policy%20in%20Namibia.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ipprna-000282)}}
- BibTeX
- @techreport{instituteforpublicpolicyresearch2009planning, author = {{Institute for Public Policy Research}}, title = {{Planning Power: Review of Electricity Policy in Namibia}}, institution = {Institute for Public Policy Research}, year = {2009}, url = {https://ippr.org.na/wp-content/uploads/2010/06/Review%20of%20Electricity%20Policy%20in%20Namibia.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ipprna-000282} }