A Sustainable Asset Valuation (SAVi) of the Uchkuduk-Kazakhstan Border Highway, Uzbekistan

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The SAVi assessment of the Uchkuduk-Kazakhstan Border Highway in Uzbekistan indicates that while the project has a low traditional benefit-cost ratio of 0.18, its sustainable benefit-cost ratio (S-BCR) is significantly higher at 1.38 to 1.95. The project is expected to generate cumulative discounted net benefits between USD 230 million and USD 567 million over a 30-year period (2022-2052), driven primarily by public revenues from raw materials trade and avoided traffic accident costs.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The project's total projected investment costs are UZS 6,278 billion (USD 599 million), which includes UZS 547 billion (USD 52 million) for taxes, duties, and social tax.
  • The assessment identifies a stark difference between traditional financial valuation and sustainable valuation. A traditional benefit-cost ratio (BCR) considering only tangible impacts is 0.18, which would typically render the project not investment-worthy. However, the sustainable BCR (S-BCR) is 1.38 in the 'low cost of accidents' scenario and 1.95 in the 'high cost of accidents' scenario.
  • Over a 30-year period from 2022 to 2052, the highway is projected to generate cumulative discounted net benefits of UZS 2,411 billion (USD 230 million) under a low cost of accidents scenario and UZS 5,942 billion (USD 567 million) under a high cost of accidents scenario.
  • The most significant positive impacts are public revenues from the trade of raw materials (UZS 6,426 billion / USD 613 million) and revenues from transport (UZS 1,129 billion / USD 107 million). In the high cost of traffic accidents scenario, avoided accident costs are valued at UZS 3,732 billion (USD 356 million).
  • The project is expected to cause negative environmental impacts, specifically an increase in air pollution and CO2 emissions resulting from road use.

Cite the original document

APA
International Institute for Sustainable Development (n.d.). A Sustainable Asset Valuation (SAVi) of the Uchkuduk-Kazakhstan Border Highway, Uzbekistan. https://www.iisd.org/system/files/2023-11/savi-uchkuduk-kazakhstan-border-highway-uzbekistan-summary.pdf
Chicago
International Institute for Sustainable Development. A Sustainable Asset Valuation (SAVi) of the Uchkuduk-Kazakhstan Border Highway, Uzbekistan. n.d. https://www.iisd.org/system/files/2023-11/savi-uchkuduk-kazakhstan-border-highway-uzbekistan-summary.pdf.
Wikipedia
{{cite report |author=International Institute for Sustainable Development |title=A Sustainable Asset Valuation (SAVi) of the Uchkuduk-Kazakhstan Border Highway, Uzbekistan |url=https://www.iisd.org/system/files/2023-11/savi-uchkuduk-kazakhstan-border-highway-uzbekistan-summary.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{internationalinstituteforsustainabledevelopmentndsustainable, author = {{International Institute for Sustainable Development}}, title = {{A Sustainable Asset Valuation (SAVi) of the Uchkuduk-Kazakhstan Border Highway, Uzbekistan}}, institution = {International Institute for Sustainable Development}, url = {https://www.iisd.org/system/files/2023-11/savi-uchkuduk-kazakhstan-border-highway-uzbekistan-summary.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated