The report analyzes the declining economic viability of the Bridgeport Harbor Unit 3 coal plant, noting a collapse in its capacity factor from 87% in 2008 to 3% in 2012. This decline is attributed to low natural gas prices, falling wholesale electricity prices, and increased renewable generation. The authors project that pre-tax earnings will remain marginal or disappear by the end of the decade, especially with anticipated new gas pipeline capacity and potential federal carbon pricing.
Key insights
- Bridgeport Harbor Unit 3 has experienced a severe decline in operational use, with its annual capacity factor dropping from 87 percent in 2008 to 3 percent in 2012.
- The financial decline of the plant is driven by broader trends in deregulated markets, specifically the collapse of natural gas prices since 2008, which has allowed gas-fired units to displace coal as the marginal unit in the New England energy market.
- Future profitability is threatened by the expected addition of new natural gas pipeline capacity into the Northeast between 2016 and 2018, which is projected to lower energy market prices even during peak winter months.
- Proposed changes to ISO New England's Forward Capacity Market (FCM), specifically a 'pay-for-performance' design, are expected to disadvantage inflexible legacy steam units like Bridgeport Harbor Unit 3 in favor of flexible units.
- The plant faces increasing costs from carbon emissions regulations, including the Regional Greenhouse Gas Initiative (RGGI) and potential new U.S. EPA New Source Performance Standards for existing sources.
- Financial modeling suggests that even under an 'Optimistic' scenario, pre-tax earnings will be significantly lower than pre-2009 levels, and under a 'Less Optimistic' scenario, earnings could essentially disappear by the end of the decade.
Cite the original document
- APA
- Schlissel, D., & Kunkel, C. (n.d.). When, Not If: Bridgeport’s Future and the Closing of PSEG’s Coal Plant. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/When-Not-If_Bridgeport-Harbor.pdf
- Chicago
- Schlissel, David, and Cathy Kunkel. When, Not If: Bridgeport’s Future and the Closing of PSEG’s Coal Plant. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/resources/When-Not-If_Bridgeport-Harbor.pdf.
- Wikipedia
- {{cite report |last1=Schlissel |first1=David |last2=Kunkel |first2=Cathy |title=When, Not If: Bridgeport’s Future and the Closing of PSEG’s Coal Plant |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/resources/When-Not-If_Bridgeport-Harbor.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-002084)}}
- BibTeX
- @techreport{schlisselndwhen, author = {Schlissel, David and Kunkel, Cathy}, title = {{When, Not If: Bridgeport’s Future and the Closing of PSEG’s Coal Plant}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/resources/When-Not-If_Bridgeport-Harbor.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-002084} }
Full text
Collected · Record updated