This report warns that Puerto Rico's plan to add 3,000 MW of new generation capacity will lead to a system that is substantially oversized, increasing costs for consumers and creating a dependency on fossil fuels that undermines its 2050 renewable energy mandate.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Puerto Rico is at risk of significantly oversizing its centralized generation system, with a projected capacity reserve margin of 80% to 90% through 2044 if all proposed projects are completed.
  • The government's decision to procure 3,000 MW of new generation was made outside the Integrated Resource Plan (IRP) process, meaning there was no modeling to determine if this capacity is necessary or if distributed generation would be more cost-effective.
  • The goal of 100% renewable energy by 2050 is unlikely to be met if the island relies on biodiesel or green hydrogen, as biodiesel is not cost-competitive and green hydrogen is logistically and economically unviable for large-scale power generation.
  • Biodiesel is an ineffective alternative for decarbonization because it is not zero-emission and its production can lead to greenhouse gas emissions from land-use changes that may exceed those of conventional diesel.
  • Green hydrogen is considered inefficient for electricity generation compared to direct use of renewables, and imported green ammonia is estimated to be approximately three times more expensive than conventional ammonia.
  • The continued dependence on natural gas perpetuates conflicts of interest with New Fortress Energy, which acts as both the fuel supplier and the operator of thermoelectric plants, leading to risks of supply disruptions used as leverage in contract negotiations.

Cite the original document

APA
Kunkel, C. (n.d.). Generación de combustibles fósiles en Puerto Rico. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-05/Spanish%20version_Puerto%20Rico%20combustibles%20f%C3%B3siles_Abril%20de%202026.pdf
Chicago
Kunkel, Cathy. Generación de combustibles fósiles en Puerto Rico. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2026-05/Spanish%20version_Puerto%20Rico%20combustibles%20f%C3%B3siles_Abril%20de%202026.pdf.
Wikipedia
{{cite report |last1=Kunkel |first1=Cathy |title=Generación de combustibles fósiles en Puerto Rico |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2026-05/Spanish%20version_Puerto%20Rico%20combustibles%20f%C3%B3siles_Abril%20de%202026.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001953)}}
BibTeX
@techreport{kunkelndgeneracin, author = {Kunkel, Cathy}, title = {{Generación de combustibles fósiles en Puerto Rico}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2026-05/Spanish%20version_Puerto%20Rico%20combustibles%20f%C3%B3siles_Abril%20de%202026.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001953} }

Full text

Collected · Record updated