overpaid-and-underutilized_how-capacity-payments-to-coal-fired-power-plants-could-lock-indonesia-into-a-high-cost-electricity-future-_august2017-d0e6183a405c8f7e.pdf
Summary
The report finds that PLN is committed to paying approximately US$76 billion in capacity payments for 24GW of coal-fired power between 2017 and 2026, creating a significant risk of paying for idle capacity as renewable energy costs fall.
Key insights
- PLN is estimated to pay approximately US$3.16 billion per gigawatt of installed capacity in capacity payments for coal-fired plants. Based on the 2017-2026 Electricity Supply Business Plan (RUPTL), which allocates 24GW of coal-fired and mine-mouth capacity to independent power producers (IPPs), the total estimated payment over 25-year power purchase agreements (PPAs) is US$76 billion.
- In the Java-Bali system, planned capacity increases could push the reserve margin to over 40%, reaching 55% in 2019, far exceeding PLN's target of 25-30%. IEEFA estimates that if 40% of the 12,845MW of IPP coal capacity assigned to Java-Bali (2017-2026) remains undispatched, PLN would be obligated to pay US$16.2 billion for idle capacity over 25 years.
- There is a significant discrepancy between electricity demand projections. IEEFA projects a need for an additional 286.4 TWh by 2030, whereas the Draft RUKN 2015-2034 projected 575 TWh. This overestimation of 288.6 TWh could lead to massive excess capacity and high costs for PLN and consumers.
- Capacity payments disincentivize the procurement of renewable energy because PLN must continue paying thermal power IPPs regardless of whether the power is dispatched. As renewables have near-zero marginal costs, they push thermal plants down the 'merit order', leading to lower utilization rates for coal plants.
- The cost of coal power is inflationary because fixed and variable operation and maintenance (O&M) costs are indexed to inflation. In contrast, the levelized cost of electricity (LCOE) for solar in Indonesia was USD 17 cents/kWh in 2016 and is projected to become grid competitive at around USD 8 cents/kWh by 2021.
- Indonesia's historical use of capacity payments has created financial vulnerability. During the 1997 Asian financial crisis, PLN struggled to honor take-or-pay clauses for 27 IPP contracts, exacerbated by the fact that payments were in US dollars while revenues were in Indonesian rupiah.
- Regulation No. 12/2017 aims to increase renewable energy by indexing tariffs to PLN's regional production costs (BPP), capping them at 85% of regional costs if those are higher than the national average, or 100% if they are lower. This makes renewables more competitive, especially in outer regions where BPP is higher than in Java-Bali.
- For rural electrification, particularly in remote islands currently relying on expensive imported diesel, renewable mini-grids and off-grid systems are a more cost-effective modular option than the current diesel-driven plan.
Cite the original document
- APA
- Chung, Y. (n.d.). overpaid-and-underutilized_how-capacity-payments-to-coal-fired-power-plants-could-lock-indonesia-into-a-high-cost-electricity-future-_august2017-d0e6183a405c8f7e.pdf. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Overpaid-and-Underutilized_How-Capacity-Payments-to-Coal-Fired-Power-Plants-Could-Lock-Indonesia-into-a-High-Cost-Electricity-Future-_August2017.pdf
- Chicago
- Chung, Yulanda. overpaid-and-underutilized_how-capacity-payments-to-coal-fired-power-plants-could-lock-indonesia-into-a-high-cost-electricity-future-_august2017-d0e6183a405c8f7e.pdf. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/resources/Overpaid-and-Underutilized_How-Capacity-Payments-to-Coal-Fired-Power-Plants-Could-Lock-Indonesia-into-a-High-Cost-Electricity-Future-_August2017.pdf.
- Wikipedia
- {{cite report |last1=Chung |first1=Yulanda |title=overpaid-and-underutilized_how-capacity-payments-to-coal-fired-power-plants-could-lock-indonesia-into-a-high-cost-electricity-future-_august2017-d0e6183a405c8f7e.pdf |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/resources/Overpaid-and-Underutilized_How-Capacity-Payments-to-Coal-Fired-Power-Plants-Could-Lock-Indonesia-into-a-High-Cost-Electricity-Future-_August2017.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001776)}}
- BibTeX
- @techreport{chungndoverpaidandunderutilizedhowcapacitypaymentstocoalfiredpowerplantscouldlockindonesiaintoahighcostelectricityfutureaugust2017d0e6183a405c8f7epdf, author = {Chung, Yulanda}, title = {{overpaid-and-underutilized\_how-capacity-payments-to-coal-fired-power-plants-could-lock-indonesia-into-a-high-cost-electricity-future-\_august2017-d0e6183a405c8f7e.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/resources/Overpaid-and-Underutilized_How-Capacity-Payments-to-Coal-Fired-Power-Plants-Could-Lock-Indonesia-into-a-High-Cost-Electricity-Future-_August2017.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001776} }
Full text
Collected · Record updated