Cleaning Up the Last Pile of India’s Power Sector Non-Performing Assets

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report proposes an 'acquire-retire-repurpose' model for India's power sector NPAs, identifying 6.1 GW of stressed thermal assets that NTPC could acquire through partnerships with PPL and NARCL to avoid the risks associated with new coal investments.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Strategic acquisitions and the subsequent revival of stranded power sector capacity in India are presented as a viable alternative to adding new thermal assets to ensure energy security.
  • The report identifies six stressed power sector assets with a combined capacity of 6.1 gigawatts (GW) that are suitable for acquisition by NTPC in collaboration with PFC Projects Limited (PPL) and the National Asset Reconstruction Company Limited (NARCL).
  • Investing in new thermal power plants risks creating future stranded assets and increasing climate and credit risks for domestic banks, given the economic advantages of renewable energy.
  • An 'acquire-retire-repurpose' strategy is proposed where companies like NTPC buy stranded plants for short-term needs, then retire and repurpose them for renewable energy to maintain their environmental, social and governance (ESG) profiles.
  • The Indian banking sector's net NPAs decreased to approximately 1.3% in September 2022 from a peak of 6.1% in March 2018, aided by write-offs totaling nearly US$124 billion over five years.
  • The National Asset Reconstruction Company Limited (NARCL) can use a 15:85 cash-to-security-receipts structure to aggregate stressed assets and resolve them in partnership with technical experts like NTPC.

Cite the original document

APA
Srivastava, S. (n.d.). Cleaning Up the Last Pile of India’s Power Sector Non-Performing Assets. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-06/IEEFA_Cleaning%20up%20the%20last%20pile%20of%20India%27s%20power%20sector%20non-performing%20assets_June2023_0.pdf
Chicago
Srivastava, Shantanu. Cleaning Up the Last Pile of India’s Power Sector Non-Performing Assets. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2023-06/IEEFA_Cleaning%20up%20the%20last%20pile%20of%20India%27s%20power%20sector%20non-performing%20assets_June2023_0.pdf.
Wikipedia
{{cite report |last1=Srivastava |first1=Shantanu |title=Cleaning Up the Last Pile of India’s Power Sector Non-Performing Assets |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2023-06/IEEFA_Cleaning%20up%20the%20last%20pile%20of%20India%27s%20power%20sector%20non-performing%20assets_June2023_0.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001543)}}
BibTeX
@techreport{srivastavandcleaning, author = {Srivastava, Shantanu}, title = {{Cleaning Up the Last Pile of India’s Power Sector Non-Performing Assets}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2023-06/IEEFA_Cleaning%20up%20the%20last%20pile%20of%20India%27s%20power%20sector%20non-performing%20assets_June2023_0.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001543} }

Full text

Collected · Record updated