Making the Energy Transition Mechanism Meaningful: A Case Study from Pakistan

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that medium-sized, middle-aged thermal plants are the most viable near-term candidates for an Energy Transition Mechanism (ETM) in Pakistan, while coal plants should be retired after completing debt servicing.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Medium-sized, middle-aged thermal plants, specifically Saif Power Limited, Halmore Power Generation Co Ltd, and Sapphire Electric Company Limited, are identified as viable near-term ETM candidates. Immediate retirement of these plants would result in valuations between US$47 million and US$51 million each, while retiring them 10 years before the end of their 30-year contracts would reduce valuations to US$17.5 million to US$18.6 million per plant.
  • Pakistan's coal fleet is too young for immediate ETM retirement to be economically prudent; IEEFA suggests waiting until these plants have fully paid their loans and are at least 10 years old. Immediate retirement of selected coal plants is valued at US$1.1 billion to US$1.6 billion, but this drops to US$111 million to US$174.8 million if terminated 10 years before the contract ends.
  • The environmental benefit of retiring coal plants is significant, with immediate retirement potentially avoiding up to 250Mt of CO2 emissions per plant, and 73Mt to 90Mt per plant if the PPA term is reduced by 10 years.
  • The retirement of the thermal trio (Halmore, Saif, and Sapphire) is further supported by the National Transmission and Despatch Company's Transmission System Expansion Plan (TSEP), which aims to remove transmission constraints around Lahore by 2025-2026, likely rendering these plants unnecessary.
  • Coal plant retirement in Pakistan is complicated by intergovernmental agreements and sovereign guarantees, requiring high-level consensus between Pakistani and Chinese authorities.
  • To be effective, ETM plant closures in Pakistan must be bundled with investments in renewable energy, storage, and grid improvements rather than being stand-alone transactions.

Cite the original document

APA
Isaad, H., & Hauber, G. (n.d.). Making the Energy Transition Mechanism Meaningful: A Case Study from Pakistan. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-10/IEEFA%20Report%20-%20Pakistan%20ETM%20Report%20Oct2023.pdf
Chicago
Isaad, Haneea, and Grant Hauber. Making the Energy Transition Mechanism Meaningful: A Case Study from Pakistan. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2023-10/IEEFA%20Report%20-%20Pakistan%20ETM%20Report%20Oct2023.pdf.
Wikipedia
{{cite report |last1=Isaad |first1=Haneea |last2=Hauber |first2=Grant |title=Making the Energy Transition Mechanism Meaningful: A Case Study from Pakistan |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2023-10/IEEFA%20Report%20-%20Pakistan%20ETM%20Report%20Oct2023.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001396)}}
BibTeX
@techreport{isaadndmaking, author = {Isaad, Haneea and Hauber, Grant}, title = {{Making the Energy Transition Mechanism Meaningful: A Case Study from Pakistan}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2023-10/IEEFA%20Report%20-%20Pakistan%20ETM%20Report%20Oct2023.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001396} }

Full text

Collected · Record updated