Repurposing Pakistan's coal-based assets
Summary
This fact sheet argues that the early retirement of the 1,320-MW Sahiwal Coal-Fired Power Plant is feasible through upfront compensation or ROE reductions, potentially avoiding up to USD 5 billion in capacity payments.
Key insights
- The early retirement of the 1,320-MW Sahiwal Coal-Fired Power Plant (CFPP) is presented as a bankable case that could avoid up to USD 5 billion in capacity payments over the plant's lifetime and prevent up to 38 million tonnes of carbon emissions annually.
- There are three primary feasible pathways for early retirement: an upfront buyout with compensation between USD 0.4 billion and USD 1.5 billion; a reduction in the agreed Return on Equity (ROE) by 0.5%–2.5% to achieve equivalent returns 6–10 years earlier; or a staggered payment structure.
- A high-likelihood scenario involves restructuring USD 59 million of investor equity into a 280MW hybrid renewable array (51MW solar, 197MW wind, and 31MW battery storage) at a total cost of USD 300 million, producing 1 TWh per year at approximately USD 6.2 cents per kWh.
- The Sahiwal CFPP is an ideal pilot for accelerated retirement because its debt amortization is nearly complete, equity profits are dominant, and it has a low average utilization rate of 22.6% for FY2023–FY2024.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (n.d.). Repurposing Pakistan's coal-based assets. https://ieefa.org/sites/default/files/2025-11/IEEFA%20Fact%20Sheet_Establishing%20a%20replicable%20coal%20retirement%20model%20for%20Pakistan_November2025.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. Repurposing Pakistan's coal-based assets. n.d. https://ieefa.org/sites/default/files/2025-11/IEEFA%20Fact%20Sheet_Establishing%20a%20replicable%20coal%20retirement%20model%20for%20Pakistan_November2025.pdf.
- Wikipedia
- {{cite report |author=Institute for Energy Economics and Financial Analysis |title=Repurposing Pakistan's coal-based assets |url=https://ieefa.org/sites/default/files/2025-11/IEEFA%20Fact%20Sheet_Establishing%20a%20replicable%20coal%20retirement%20model%20for%20Pakistan_November2025.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001371)}}
- BibTeX
- @techreport{instituteforenergyeconomicsandfinancialanalysisndrepurposing, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Repurposing Pakistan's coal-based assets}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-11/IEEFA%20Fact%20Sheet_Establishing%20a%20replicable%20coal%20retirement%20model%20for%20Pakistan_November2025.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001371} }
Full text
Collected · Record updated