The Amigo LNG project faces a critical gas supply deficit because the Sásabe-Guaymas pipeline cannot simultaneously support the facility's 745 MMcf/d requirement and the 357 MMcf/d needed by four regional power plants. This shortfall poses a significant risk to the project's ability to secure government permits and attract investment.
Key insights
- The Sásabe-Guaymas pipeline has a maximum capacity of 812 MMcf/d, which is 300 MMcf/d less than the 1,102 MMcf/d required to fully power both the Amigo LNG facility (745 MMcf/d) and four gas-fired power plants in northwestern Mexico (357 MMcf/d).
- During operational periods, Amigo LNG's typical demand would be roughly 800 MMcf/d, leaving very little gas for the four power plants. Furthermore, daily peak consumption surges of about 10 percent could leave essentially no gas for the two Empalme power plants.
- If the project experiences process losses of 11 percent—similar to the Fast LNG project off the coast of Altamira—rather than the assumed 2 percent, the facility's daily gas requirements could exceed the entire capacity of the Sásabe-Guaymas pipeline.
- The project's gas demand could obstruct the development of the proposed 400 MMcf/d Centauro del Norte pipeline, which is intended to serve industrial gas users and power plants in northern Baja California and western Sonora.
- Potential solutions to the supply gap, such as building additional compressor stations, completing the stalled El Oro-Guaymas pipeline, or constructing new U.S.-to-Guaymas pipelines, are expensive and have not been formally proposed to investors or regulators.
Cite the original document
- APA
- Williams-Derry, C. (2026). Amigo LNG export project that’s running out of gas. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/amigo-lng-export-project-thats-running-out-gas
- Chicago
- Williams-Derry, Clark. Amigo LNG export project that’s running out of gas. Institute for Energy Economics and Financial Analysis, 2026. https://ieefa.org/resources/amigo-lng-export-project-thats-running-out-gas.
- Wikipedia
- {{cite report |last1=Williams-Derry |first1=Clark |title=Amigo LNG export project that’s running out of gas |publisher=Institute for Energy Economics and Financial Analysis |date=26 March 2026 |url=https://ieefa.org/resources/amigo-lng-export-project-thats-running-out-gas |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000799)}}
- BibTeX
- @techreport{williamsderry2026amigo, author = {Williams-Derry, Clark}, title = {{Amigo LNG export project that’s running out of gas}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = mar, url = {https://ieefa.org/resources/amigo-lng-export-project-thats-running-out-gas}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000799} }
Full text
Collected · Record updated