Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Green Hydrogen Roadmap for Nepal proposes a three-phase transition to achieve widespread green hydrogen adoption by 2050, targeting a 60% reduction in fertilizer imports and the replacement of significant portions of coal, diesel, and LPG.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Nepal's current energy profile is heavily dependent on fossil fuels in the industry and transport sectors, which hinders the achievement of its Nationally Determined Contribution (NDC) target of a 15% clean energy share by 2030.
  • The Government of Nepal launched the Green Hydrogen Policy 2080 in January 2024, which provides a first step toward production and management but lacks a detailed implementation framework, concrete targets, and comprehensive financial mechanisms.
  • Green hydrogen production using Nepal's hydropower potential is identified as a critical pathway to reduce reliance on imported chemical fertilizers, with a target to achieve 60% substitution of fertilizer imports through domestic production by 2050.
  • The roadmap's first phase (2024-2027) focuses on feasibility and demonstration, aiming to establish 2-5 pilot projects with a production capacity of 500-1000 MW and an investment of $700-$1500 million.
  • The second phase (2028-2035) targets the deployment of commercial-scale facilities with an installation capacity of 1200-3000 MW and the establishment of 50 hydrogen refueling stations.
  • The final phase (2036-2050) aims for expansion and integration, targeting an electrolyzer capacity of 3,000-6,000 MW and the replacement of 25% of coal, 20% of diesel, and 15% of LPG in targeted sectors.
  • The total investment required across the three phases is estimated to range from $2.2 billion to $13.5 billion, potentially creating between 27,000 and 54,000 new jobs by 2050.
  • Nepal can leverage its limited existing fossil fuel infrastructure to 'leapfrog' directly to cleaner technologies, avoiding the costs associated with extensive retrofitting.

Cite the original document

APA
Global Green Growth Institute (2024). Green Hydrogen Roadmap for Nepal. https://gggi.org/wp-content/uploads/2025/08/GGGI_Green_Hydrogen_roadmap_Nepal_Final.pdf
Chicago
Global Green Growth Institute. Green Hydrogen Roadmap for Nepal. 2024. https://gggi.org/wp-content/uploads/2025/08/GGGI_Green_Hydrogen_roadmap_Nepal_Final.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=Green Hydrogen Roadmap for Nepal |date=November 2024 |url=https://gggi.org/wp-content/uploads/2025/08/GGGI_Green_Hydrogen_roadmap_Nepal_Final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000509)}}
BibTeX
@techreport{globalgreengrowthinstitute2024green, author = {{Global Green Growth Institute}}, title = {{Green Hydrogen Roadmap for Nepal}}, institution = {Global Green Growth Institute}, year = {2024}, month = nov, url = {https://gggi.org/wp-content/uploads/2025/08/GGGI_Green_Hydrogen_roadmap_Nepal_Final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000509} }

Full text

Collected · Record updated