DELHIS OBSESSION WITH WASTE-TO-ENERGY INCINERATORS

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document argues that the Timarpur-Okhla waste-to-energy project is technically unfeasible due to the low calorific value of Indian waste and socially detrimental because it threatens the livelihoods of approximately 100,000 waste pickers.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • A previous waste-to-energy plant at Timarpur, commissioned in 1987 for Rs. 20 crores, failed after 21 days of trial operations because the calorific value of the waste (600-700 kcal/kg) was significantly lower than the required 1462.5 kcal/kg.
  • The Timarpur-Okhla project has deviated significantly from its original Environmental Impact Assessment (EIA) approved by the Ministry of Environment and Forests, including dropping the Timarpur plant and biodigestion components, and reducing the estimated gross calorific value of fuel to 1100-1500 kcal/kg.
  • The project threatens the livelihoods of approximately 100,000 waste pickers in Delhi who recover 1,600 tons of usable materials daily, saving the municipality approximately US$ 14,000 per day in operational costs.
  • The project's claim of reducing greenhouse gas emissions via the Clean Development Mechanism (CDM) is contested because it ignores the fact that Delhi's informal recycling sector prevents 962,133 tons of emissions annually, which is about 3.6 times more than the incinerator's projected reductions.
  • The project is located in a densely populated area of South Delhi with human settlements barely 100 meters from the site, and it is in violation of city zoning laws and the Municipal Solid Waste Act of 2000.
  • The project's environmental clearance process was flawed; the public hearing announcement failed to mention power generation, resulting in no public attendance, and the EIA report was not made available for public comment.

Cite the original document

APA
Shah, D. (2011). DELHIS OBSESSION WITH WASTE-TO-ENERGY INCINERATORS. Global Alliance for Incinerator Alternatives. https://www.no-burn.org/wp-content/uploads/2021/11/Timarpur.pdf
Chicago
Shah, Dharmesh. DELHIS OBSESSION WITH WASTE-TO-ENERGY INCINERATORS. Global Alliance for Incinerator Alternatives, 2011. https://www.no-burn.org/wp-content/uploads/2021/11/Timarpur.pdf.
Wikipedia
{{cite report |last1=Shah |first1=Dharmesh |title=DELHIS OBSESSION WITH WASTE-TO-ENERGY INCINERATORS |publisher=Global Alliance for Incinerator Alternatives |date=November 2011 |url=https://www.no-burn.org/wp-content/uploads/2021/11/Timarpur.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000672)}}
BibTeX
@techreport{shah2011delhis, author = {Shah, Dharmesh}, title = {{DELHIS OBSESSION WITH WASTE-TO-ENERGY INCINERATORS}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2011}, month = nov, url = {https://www.no-burn.org/wp-content/uploads/2021/11/Timarpur.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000672} }

Full text

Collected · Record updated