The pipeline of proposed coal power plants in non-OECD countries (excluding China) contracted by 77% between 2015 and July 2021, with 552GW of projects cancelled compared to 105GW that became operational. While 27 non-OECD countries have ended new coal development, the remaining 189GW pipeline is heavily concentrated, with 80% located in nine countries, primarily across South-East Asia, South Asia, and Sub-Saharan Africa. The document highlights specific national trajectories, noting Egypt's full pivot away from coal and the continued pursuit of coal in countries like Brazil, Serbia, and Bosnia and Herzegovina.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Between 2015 and July 2021, the pipeline of proposed coal power plants in non-OECD countries, excluding China, decreased by 77%. During this period, 552GW of projects were cancelled, while only 105GW became operational, representing a cancellation-to-operation ratio of 5.3:1.
  • As of July 2021, 27 non-OECD countries have ceased the development of new coal power generation through policy commitments or project cancellations, totaling at least 58GW of capacity. Egypt is cited as a leader in this trend, having cancelled its entire 15.3GW pipeline, including the 6.6GW Hamrawein project.
  • The remaining non-OECD coal pipeline is highly concentrated, with 80% of pre-construction projects located in nine countries: India, Viet Nam, Indonesia, Bangladesh, Laos, Mongolia, Zimbabwe, Pakistan, and Bosnia & Herzegovina. Regionally, South-East Asia (42%), South Asia (32%), and Sub-Saharan Africa (13%) account for 87% of the total non-OECD pipeline (excluding China).
  • Certain countries continue to pursue coal despite global trends. Brazil indicated in August 2021 a desire to extend coal use until 2050, although new projects have failed to secure electricity sector auction contracts since 2014. In the Balkans, Serbia (1.3GW pipeline) and Bosnia and Herzegovina (2.4GW pipeline) are proceeding with projects supported by Chinese finance.
  • Mongolia possesses the world's eighth largest coal pipeline at 6GW, though 93% (5.58GW) of these projects are not yet at pre-permitted status. The country has seen a high cancellation rate, with 5.7GW cancelled for every 1GW that became operational.

Cite the original document

APA
E3G (2021). NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE. https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-3.-Non-OECD-Overview.pdf
Chicago
E3G. NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE. 2021. https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-3.-Non-OECD-Overview.pdf.
Wikipedia
{{cite report |author=E3G |title=NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE |date=2021 |url=https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-3.-Non-OECD-Overview.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001290)}}
BibTeX
@techreport{e3g2021new, author = {{E3G}}, title = {{NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE}}, institution = {E3G}, year = {2021}, url = {https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-3.-Non-OECD-Overview.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001290} }

Full text

Collected · Record updated