Browse all documents

Melhorando o Processo de Contratação de Estudos Socioambientais em Projetos de Infraestrutura Terrestre

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report by the Climate Policy Initiative (CPI/PUC-Rio) analyzes the public procurement processes for socio-environmental studies—specifically Technical, Economic, and Environmental Viability Studies (EVTEA) and Environmental Impact Studies (EIA)—for land transport infrastructure projects in the Brazilian Amazon. The analysis identifies significant gaps in transparency, a lack of clear selection and evaluation criteria in bidding documents, and an imbalance in budget allocation that favors diagnostic data over impact assessment and mitigation. The authors recommend increasing transparency in bidding, specifying budget allocation for socio-environmental components, and introducing a 'pre-feasibility' phase to filter projects before they reach the environmental licensing stage.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Public procurement for socio-environmental studies in the Amazon lacks transparency and clarity, which prevents civil society from monitoring how studies are selected, evaluated, and approved. Bidding documents often fail to specify the products to be delivered, delivery deadlines, or the percentage of the study dedicated to socio-environmental components.
  • There is a lack of clear criteria in bidding documents for EVTEA and EIA, making it difficult to understand how budgets are allocated to specific socio-environmental components. Furthermore, the government often fails to justify the maximum reimbursement prices in Manifestation of Interest (PMI) processes or the reference prices in traditional bidding.
  • Budget analysis of EIAs for the Ferrogrão railway and the BR-364 highway shows that the majority of funds are allocated to diagnostics of physical, socioeconomic, and biotic environments (54% for Ferrogrão and 57.6% for BR-364). In contrast, only 6% of the budgets in both cases are dedicated to impact assessment and the proposal of socio-environmental mitigation measures.
  • The report suggests that a significant portion of diagnostic analysis currently performed during the EIA phase could be moved to earlier stages, such as the EVTEA or a proposed new 'pre-feasibility' phase. This shift would prevent unviable projects from reaching the bidding stage and allow EIA budgets to be focused on actual impact evaluation and mitigation.

Cite the original document

APA
Chiavari, J., Antonaccio, L., & Barros, A. C. (2021). Melhorando o Processo de Contratação de Estudos Socioambientais em Projetos de Infraestrutura Terrestre. Climate Policy Initiative. https://www.climatepolicyinitiative.org/wp-content/uploads/2021/02/REL-Melhorando-o-Processo-de-Contratacao-de-Estudos-Socioambientais-em-Projetos-de-Infraestrutura-Terrestre-no-Brasil.pdf
Chicago
Chiavari, Joana, Luiza Antonaccio, and Ana Cristina Barros. Melhorando o Processo de Contratação de Estudos Socioambientais em Projetos de Infraestrutura Terrestre. Climate Policy Initiative, 2021. https://www.climatepolicyinitiative.org/wp-content/uploads/2021/02/REL-Melhorando-o-Processo-de-Contratacao-de-Estudos-Socioambientais-em-Projetos-de-Infraestrutura-Terrestre-no-Brasil.pdf.
Wikipedia
{{cite report |last1=Chiavari |first1=Joana |last2=Antonaccio |first2=Luiza |last3=Barros |first3=Ana Cristina |title=Melhorando o Processo de Contratação de Estudos Socioambientais em Projetos de Infraestrutura Terrestre |publisher=Climate Policy Initiative |date=February 2021 |url=https://www.climatepolicyinitiative.org/wp-content/uploads/2021/02/REL-Melhorando-o-Processo-de-Contratacao-de-Estudos-Socioambientais-em-Projetos-de-Infraestrutura-Terrestre-no-Brasil.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{chiavari2021melhorando, author = {Chiavari, Joana and Antonaccio, Luiza and Barros, Ana Cristina}, title = {{Melhorando o Processo de Contratação de Estudos Socioambientais em Projetos de Infraestrutura Terrestre}}, institution = {Climate Policy Initiative}, year = {2021}, month = feb, url = {https://www.climatepolicyinitiative.org/wp-content/uploads/2021/02/REL-Melhorando-o-Processo-de-Contratacao-de-Estudos-Socioambientais-em-Projetos-de-Infraestrutura-Terrestre-no-Brasil.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated