The report finds that achieving 6 GW of solar capacity in Scotland by 2030 would require the workforce to grow from approximately 800 in 2023 to over 11,000 full-time equivalents (FTEs), with a critical shortage of skilled labour across all project stages.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • To deliver 6 GW of solar capacity by 2030, Scotland's solar workforce would need to increase from approximately 800 FTEs in 2023 to an estimated maximum of over 11,000 FTEs in 2030.
  • The vast majority of the required workforce growth is for construction-related activities, accounting for 9,100 FTEs or nearly 82% of the total required workforce by 2030; these roles are often temporary and mobile.
  • Approximately 2,000 FTEs will be needed for operation and maintenance (O&M) activities by 2030, providing more permanent and sustained employment compared to construction roles.
  • There are significant skilled labour shortages across all stages of the solar project lifecycle, particularly for electricians, electrical, structural, and civil engineers, roofers, and general construction workers.
  • A critical shortage of roofers, specifically slaters and tilers, is exacerbated by an aging workforce, with 60% of the current workforce expected to retire within five years.
  • Shortages in allied sectors, specifically Distribution Network Operator (DNO) engineers and local authority planners, are creating bottlenecks that delay the planning, approval, and construction of solar projects.
  • Geographically, demand for construction and O&M FTEs for ground-mounted projects is highest in Aberdeenshire, Angus, Fife, and Tayside, which together represent 54% of the total expected installed capacity.
  • Domestic rooftop installations are expected to require a workforce anchored in population centres across the central belt of Scotland, the Borders, Dumfries and Galloway, the east and north-east, and the Inverness area.
  • The study recommends developing strategies to attract new entrants, creating dedicated renewable energy apprenticeships, and modifying existing university and college courses to include solar PV specialisations.

Cite the original document

APA
ClimateXChange (2024). Mapping current and future workforce and skills requirements in Scotland’s solar industry. https://www.climatexchange.org.uk/publications/mapping-current-and-future-workforce-and-skills-requirements-in-scotlands-solar-industry/
Chicago
ClimateXChange. Mapping current and future workforce and skills requirements in Scotland’s solar industry. 2024. https://www.climatexchange.org.uk/publications/mapping-current-and-future-workforce-and-skills-requirements-in-scotlands-solar-industry/.
Wikipedia
{{cite report |author=ClimateXChange |title=Mapping current and future workforce and skills requirements in Scotland’s solar industry |date=9 July 2024 |url=https://www.climatexchange.org.uk/publications/mapping-current-and-future-workforce-and-skills-requirements-in-scotlands-solar-industry/ |access-date=5 November 2026 |via=Climate Insights Directory (document climex-000023)}}
BibTeX
@techreport{climatexchange2024mapping, author = {{ClimateXChange}}, title = {{Mapping current and future workforce and skills requirements in Scotland’s solar industry}}, institution = {ClimateXChange}, year = {2024}, month = jul, url = {https://www.climatexchange.org.uk/publications/mapping-current-and-future-workforce-and-skills-requirements-in-scotlands-solar-industry/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document climex-000023} }

Full text

Collected · Record updated